Agenda
1
2
3
4
• Energy Potential of Our Region
• Energy Investments in our Region
• Problems with Energy Legislation
• Industry Competition Analysis of
Konya
Our Energy Politics
Solar Plants
Evaluating the
Energy Potential
of Region
Thermic Plant
Our Mission
Solar Power
Industry
Building up an
energy industrial
at the region
Wind Power
Industry
Nuclear Power
Industry
Energy Potential of Region
High
Renewable
Energy
Potential
Highest
Capacity
Permission
Strong
Industry
Ready
Investment
Lands and
Infrastructure
Energy
Incentives
Energy Potential of Region
Global Radiation (kWh/m2-day)
8
7
kWH/m2-day
6
5
4
3
2
1
0
January
February
March
April
May
June
July
August
September
October
November
December
Average
Global Radiation (kWh/m2-day) Turkey
1,79
2,5
3,87
4,93
6,14
6,57
6,5
5,81
4,81
3,46
2,14
1,59
4,18
Global Radiation (kWh/m2-day) Konya
1,98
2,56
4,23
5,2
6,3
6,78
6,81
6,05
5,12
3,73
2,35
1,77
4,41
Global Radiation (kWh/m2-day) Karaman
2,16
2,69
4,38
5,35
6,45
6,98
6,91
6,15
5,22
3,86
2,52
1,91
4,55
Global Radiation (kWh/m2-day) Karapınar
2,06
2,59
4,33
5,25
6,31
6,85
6,8
6,07
5,2
3,8
2,46
1,81
4,46
Konya %5,53,
Karapınar %6,82,
Karaman %8,92
are more efficiency than Turkey’s avarage
Energy Potential of Region
Sunshine Duration ( Hour )
14
12
10
Saat
8
6
4
2
0
January
February
March
April
Sunshine Duration ( Hour ) Turkey
4,11
5,22
6,27
Sunshine Duration ( Hour ) Konya
4,19
5,51
6,68
Sunshine Duration ( Hour ) Karaman
4,46
5,85
Sunshine Duration ( Hour ) Karapınar
4,18
5,65
Konya %5,66,
Karapınar %8,12,
Karaman %9,88
August
Septembe
r
October
November
December
Average
11,31
10,7
9,23
6,87
5,15
3,75
7,50
11,97
11,35
9,79
7,35
5,53
3,93
7,92
11,51
12,02
11,47
10,11
7,77
5,95
4,31
8,24
11,53
12,22
11,6
10,05
7,6
5,74
3,98
8,11
May
June
July
7,46
9,1
10,81
8,03
9,46
11,28
7,14
8,44
9,84
6,91
8,25
9,58
are more efficiency than Turkey’s avarage
Energy Potential of Region
Global Radiation (kWh/m2-day)
MONTHS
Sunshine Duration ( Hour )
Turkey
Konya
Karaman Karapınar
January
February
March
April
May
June
July
August
September
October
November
December
1,79
2,5
3,87
4,93
6,14
6,57
6,5
5,81
4,81
3,46
2,14
1,59
1,98
2,56
4,23
5,2
6,3
6,78
6,81
6,05
5,12
3,73
2,35
1,77
2,16
2,69
4,38
5,35
6,45
6,98
6,91
6,15
5,22
3,86
2,52
1,91
2,06
2,59
4,33
5,25
6,31
6,85
6,8
6,07
5,2
3,8
2,46
1,81
Average
4,18
4,41
4,55
4,46
Turkey
Konya
4,11
5,22
6,27
7,46
9,1
10,81
11,31
10,7
9,23
6,87
5,15
3,75
4,19
5,51
6,68
8,03
9,46
11,28
11,97
11,35
9,79
7,35
5,53
3,93
3.011,41
3.000,00
2.800,00
2.963,47
2.896,01
2.900,00
2.741,07
2.700,00
2.600,00
Turkey
Konya
Karaman
4,46
5,85
7,14
8,44
9,84
11,51
12,02
11,47
10,11
7,77
5,95
4,31
4,18
5,65
6,91
8,25
9,58
11,53
12,22
11,6
10,05
7,6
5,74
3,98
2.741,07 2.896,01 3.011,41 2.963,47
Annual Average Sunshine Duration ( Hour )
3.100,00
Karaman Karapınar
Karapınar
Annual
Average
Sunshine
Duration
( Hour )
Konya %5,66,
Karapınar %8,12,
Karaman %9,88
are more
efficiency than
Turkey’s
avarage
Energy Potential of Region
Energy Potential of Region
Paris Case
Avarage Montly Electricity Production
40.000,00
250,00
35.000,00
kWh
25.000,00
150,00
20.000,00
100,00
15.000,00
10.000,00
(kWh/m2)
200,00
30.000,00
50,00
5.000,00
0,00
0,00
Jan
Feb
Mar
Apr
Paris
May
Jun
Konya
Jul
Aug
Paris
Sep
Oct
Nov
Dec
Konya
Konya is
%49,61
more efficiency than Paris’s avarage for Avarage Montly Electricity Production
Konya is
%51,45
more efficiency than Paris’s avarage for Avarage Montly Irradiation per
square meter
Values are taken from PVGIS site.
http://re.jrc.ec.europa.eu/pvgis/apps4/pvest.php
Energy Potential of Region
Paris Case
Konya is
350.000,00
35.000,00 EUR
%49,61
300.000,00
30.000,00 EUR
250.000,00
25.000,00 EUR
more efficiency than Paris’s
Yearly Elecricity Production
200.000,00
20.000,00 EUR
150.000,00
15.000,00 EUR
100.000,00
10.000,00 EUR
The Power Plant in
Konya is
50.000,00
5.000,00 EUR
%97,07
0,00 EUR
more efficiency than Paris’s
Annual Revenue
0,00
Paris
Euro
kWh
Annual Elecricity Production and Revenue
Konya
Yearly Electricity Production (kWh)
Annual Revenue (Euro)
Paris
Month
Average daily
electricity
production
Ed
Average daily
Average monthly
Average sum of
sum of global
electricity
global irradiation
irradiation per
production
per square meter
square meter
Em
Hm
Hd
(kWh)
Yearly
average
580,08
Konya
(kWh)
17.666,67
Month
(kWh)
(kWh/m2)
(kWh/m2)
114,96
3,77
Average daily
electricity
production
Ed
Average
monthly
electricity
production
Em
Yearly
average
867,92
Average daily Average sum of
sum of global
global
irradiation per irradiation per
square meter square meter
Hd
Hm
(kWh)
(kWh/m2)
(kWh/m2)
26.416,67
5,71
173,92
Total for
year
212.000,00
1.379,50
Total for
year
317.000,00
2.087,00
Annual
Revenue
15.603,20 EUR
0,0736 Euro / kWh
Annual
Revenue
30.749,00 EUR
0,097 Euro / kWh
Values are taken from PVGIS site. http://re.jrc.ec.europa.eu/pvgis/apps4/pvest.php
Tariffs taken from CRE site. http://www.cre.fr/documents/deliberations/communication/coefficients-s11-et-v11
Energy Potential of Region
Berlin Case
Avarage Montly Electricity Production
40.000,00
250,00
35.000,00
kWh
25.000,00
150,00
20.000,00
100,00
15.000,00
10.000,00
(kWh/m2)
200,00
30.000,00
50,00
5.000,00
0,00
0,00
Jan
Feb
Mar
Apr
Berlin
May
Jun
Konya
Jul
Aug
Berlin
Sep
Oct
Nov
Dec
Konya
Konya is
%81,15
more efficiency than Berlin’s avarage for Avarage Montly Electricity Production
Konya is
%82,45
more efficiency than Berlin’s avarage for Avarage Montly Irradiation per
square meter
Values are taken from PVGIS site.
http://re.jrc.ec.europa.eu/pvgis/apps4/pvest.php
Energy Potential of Region
Berlin Case
Konya is
350.000,00
35.000,00 EUR
%81,15
300.000,00
30.000,00 EUR
250.000,00
25.000,00 EUR
more efficiency than
Berlin’s Yearly Elecricity
Production
200.000,00
20.000,00 EUR
150.000,00
15.000,00 EUR
100.000,00
10.000,00 EUR
The Power Plant in
Konya is
50.000,00
5.000,00 EUR
%69,61
0,00 EUR
more efficiency than
Berlin’s Annual Revenue
0,00
Berlin
Euro
kWh
Annual Elecricity Production and Revenue
Konya
Yearly Electricity Production (kWh)
Annual Revenue (Euro)
Berlin
Month
Average daily
electricity
production
Ed
Average daily
Average monthly
Average sum of
sum of global
electricity
global irradiation
irradiation per
production
per square meter
square meter
Em
Hm
Hd
(kWh)
Yearly
average
478,50
Konya
(kWh)
14.582,50
Total for
year
174.990,00
Annual
Revenue
18.128,96 EUR
Month
(kWh)
(kWh/m2)
(kWh/m2)
95,36
3,13
1.144,30
0,1153 Euro / kWh (Av. 0,1036 E)
Monthly %1,48 Decline
Average daily
electricity
production
Ed
Average
monthly
electricity
production
Em
Yearly
average
867,92
Average daily Average sum of
sum of global
global
irradiation per irradiation per
square meter square meter
Hd
Hm
(kWh)
(kWh/m2)
(kWh/m2)
26.416,67
5,71
173,92
Total for
year
317.000,00
2.087,00
Annual
Revenue
30.749,00 EUR
0,097 Euro / kWh
Values are taken from PVGIS site. http://re.jrc.ec.europa.eu/pvgis/apps4/pvest.php
Tariffs taken from Bundesnetzagentur site.
http://www.bundesnetzagentur.de/cln_1432/DE/Sachgebiete/ElektrizitaetundGas/Unternehmen_Institutionen/ErneuerbareEnergien/Photovoltaik/DatenMeldgn
_EEG-VergSaetze/DatenMeldgn_EEG-VergSaetze_node.html;jsessionid=5579EEAD06F7DC40B17FF710F2BE5806#doc405794bodyText4
Energy Potential of Region
Malaga Case
Avarage Montly Electricity Production
40.000,00
250,00
35.000,00
kWh
25.000,00
150,00
20.000,00
100,00
15.000,00
10.000,00
(kWh/m2)
200,00
30.000,00
50,00
5.000,00
0,00
0,00
Jan
Feb
Mar
Apr
Malaga
May
Jun
Konya
Jul
Aug
Malaga
Sep
Oct
Nov
Dec
Konya
Konya is
%10,05
more efficiency than Malaga’s avarage for Avarage Montly Electricity Production
Konya is
%6,72
more efficiency than Malaga’s avarage for Avarage Montly Irradiation per square
meter
Values are taken from PVGIS site.
http://re.jrc.ec.europa.eu/pvgis/apps4/pvest.php
Energy Potential of Region
Malaga Case
Annual Elecricity Production and Revenue
320.000,00
45.000,00 EUR
%10,05
280.000,00
40.000,00 EUR
240.000,00
35.000,00 EUR
more efficiency than
Malaga’s Yearly Elecricity
Production
30.000,00 EUR
200.000,00
25.000,00 EUR
160.000,00
Euro
kWh
Konya is
20.000,00 EUR
120.000,00
The Power Plant in
Konya is
15.000,00 EUR
80.000,00
10.000,00 EUR
40.000,00
5.000,00 EUR
0,00
%20,91
less efficiency than
Malaga’s Annual Revenue
0,00 EUR
Malaga
Konya
Yearly Electricity Production (kWh)
Annual Revenue (Euro)
Malaga
Month
Average daily
electricity
production
Ed
Average daily
Average monthly
Average sum of
sum of global
electricity
global irradiation
irradiation per
production
per square meter
square meter
Em
Hm
Hd
(kWh)
Yearly
average
788,17
Konya
(kWh)
24.000,00
Month
(kWh)
(kWh/m2)
(kWh/m2)
162,92
5,35
Average daily
electricity
production
Ed
Average
monthly
electricity
production
Em
Yearly
average
867,92
Average daily Average sum of
sum of global
global
irradiation per irradiation per
square meter square meter
Hd
Hm
(kWh)
(kWh/m2)
(kWh/m2)
26.416,67
5,71
173,92
Total for
year
288.000,00
1.955,00
Total for
year
317.000,00
2.087,00
Annual
Revenue
38.880,00 EUR
0,135 Euro / kWh
Annual
Revenue
30.749,00 EUR
0,097 Euro / kWh
Values are taken from PVGIS site. http://re.jrc.ec.europa.eu/pvgis/apps4/pvest.php
Tariffs taken from El Ministro de Industria, Turismo y Comercio
http://www.boe.es/boe/dias/2010/11/23/pdfs/BOE-A-2010-17976.pdf
Energy Potential of Region
Month
PVGIS
Average monthly
electricity production
Em
(kWh)
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Total
17.400,00
19.700,00
26.400,00
27.500,00
30.400,00
30.800,00
32.900,00
33.700,00
31.600,00
27.600,00
22.400,00
16.600,00
317.000,00
MEDAS Power Plant
Eelectricity production
Em
(kWh)
16.660,00
20.800,00
27.450,00
30.790,00
36.570,00
37.900,00
40.630,00
40.190,00
34.850,00
31.740,00
20.150,00
13.620,00
351.350,00
Efficiency of
Generated to
Calculated
Annual Revenue of
MEDAS Power Plant
-4,25
5,58
3,98
11,96
20,30
23,05
23,50
19,26
10,28
15,00
-10,04
-17,95
8,39
1.616,02 EUR
2.017,60 EUR
2.662,65 EUR
2.986,63 EUR
3.547,29 EUR
3.676,30 EUR
3.941,11 EUR
3.898,43 EUR
3.380,45 EUR
3.078,78 EUR
1.954,55 EUR
1.321,14 EUR
34.080,95 EUR
Konya, %8,39
Regarding average
montly energy
production Konya’s
actual value is more
efficient than
calculated.
Annual Elecricity Production and Revenue
350.000,00
40.000,00 EUR
300.000,00
35.000,00 EUR
30.000,00 EUR
200.000,00
25.000,00 EUR
150.000,00
20.000,00 EUR
100.000,00
15.000,00 EUR
50.000,00
0,00
10.000,00 EUR
Malaga
Konya
Berlin
Paris
Konya
(Calculated) (Calculated) (Calculated) (Calculated) (Produced)
Yearly Electricity Production (kWh)
Annual Revenue (Euro)
Euro
kWh
250.000,00
Energy Potential of Region
Total Electricity Cunsumption
(MWh)
250.000.000
Turkey has
%6,65
200.000.000
150.000.000
Avarage Annual
Electricity
compsumption
growth
100.000.000
50.000.000
0
2000
2002
2004
2006
2008
2010
2012
2014
Electricity Compsumption of Turkey
100,00
90,00
2,60
8,13
2,49
7,53
2,45
6,88
2,65
7,12
2,92
7,40
2,33
7,04
2,53
6,58
2,05
6,20
2,33
22,80
23,75
24,09
23,51
24,44
24,95
24,07
23,79
23,28
22,54
10,56
11,52
12,92
14,24
14,16
14,92
14,76
15,95
16,12
16,40
16,33
49,04
49,30
49,17
47,82
47,55
47,57
46,22
44,92
46,11
47,28
47,35
4,45
4,07
3,74
3,58
4,23
4,47
4,53
4,46
4,13
3,91
4,51
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
10,40
10,03
8,77
2,67
2,54
22,88
80,00
70,00
60,00
50,00
40,00
30,00
20,00
10,00
0,00
State Offices Consumption (MWh)
Industrial Consumption ( MWh)
Commercial Comsuption (MWh)
Residental Comsupmtion (MWh)
Agricultural irrigation (MWh)
Loss or Leak or Other Compsumptions
Energy Potential of Region
Total Electricity Cunsumption
(MWh)
Konya has
%13,09
6.000.000
4.000.000
Avarage Annual
Electricity
compsumption
growth
2.000.000
0
2000
2002
2004
2006
2008
2010
2012
2014
Electricity Compsumption of Konya
100,00
90,00
80,00
14,37
8,32
7,09
11,19
11,95
6,80
13,45
7,46
11,59
4,64
4,35
3,67
13,89
16,87
15,52
13,24
70,00
17,14
16,81
60,00
6,75
6,54
19,06
7,47
15,90
15,85
7,62
8,31
17,40
8,77
50,00
40,00
13,17
3,88
20,61
18,19
21,42
18,30
10,10
10,39
15,73
13,80
10,06
30,00
20,00
11,02
11,85
15,64
26,30
4,09
55,50
55,51
51,06
55,06
54,05
47,80
43,45
49,75
45,10
39,51
31,96
10,00
0,00
1,68
2002
1,10
2003
2,11
2004
2,15
2005
2,37
3,81
4,51
5,67
5,05
2,86
3,37
2006
2007
2008
2009
2010
2011
2012
State Offices Consumption (MWh)
Industrial Consumption ( MWh)
Commercial Comsuption (MWh)
Residental Comsupmtion (MWh)
Agricultural irrigation (MWh)
Loss or Leak or Other Compsumptions
Energy Potential of Region
Total Electricity Cunsumption
(MWh)
Karaman has
%9,40
600000
400000
200000
0
2000
2002
2004
2006
2008
2010
2012
2014
Avarage Annual
Electricity
compsumption
growth
Electricity Compsumption of Karaman
100,00
90,00
6,58
12,90
10,79
6,28
4,93
10,02
15,70
12,83
12,18
18,20
23,44
80,00
29,42
25,92
70,00
25,88
13,09
28,74
30,84
27,18
23,81
25,28
19,09
60,00
50,00
5,65
14,44
22,43
40,00
5,57
21,76
7,71
20,53
6,33
19,80
19,87
18,46
18,75
6,66
6,97
7,15
33,99
33,08
34,76
20,09
19,05
19,16
9,75
8,02
30,78
29,31
12,55
9,61
38,07
37,63
11,38
30,00
20,00
31,39
29,77
30,60
3,41
3,39
5,74
2,99
3,79
5,87
5,43
5,38
2,06
2,41
2,68
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
32,63
10,00
0,00
State Offices Consumption (MWh)
Industrial Consumption ( MWh)
Commercial Comsuption (MWh)
Residental Comsupmtion (MWh)
Agricultural irrigation (MWh)
Loss or Leak or Other Compsumptions
Energy Potential of Region
Ratio of Electricity Cunsumption to Turkey
3,50
3,00
2,50
%
2,00
1,50
1,00
0,50
0,00
2000
2002
2004
2006
Konya
2008
Karaman
2010
2012
TR52
Konya has a 2,77% annual average in Turkey's electricity
consumption
Karaman has a 0,27% annual average in Turkey's electricity
consumption
2014
Energy Investments in Region
Applications of Unlicensed Energy
100%
90%
80%
39,67
70%
60%
73,16
85,62
9,60
%
50%
40%
30%
50,72
3,80
20%
10%
0%
Türkiye (Others)
23,04
1,37
13,01
Total Application
Approved Application
Evaluating Application
1251
750
219
Karaman
65
12
53
Konya
394
114
280
Energy Investments in Region
Applications of Unlicensed Solar Energy
100%
90%
80%
70%
60%
79,19
86,47
%
50%
93,46
95,35
95,45
6,54
4,65
Number of
Application for
Temporary
Acceptance
4,65
40%
30%
20%
1,94
10%
18,87
2,90
10,63
0%
Türkiye (Others)
Number of Approved
Application
Number of
Application for
Project
Number of Approved
Project
Number of Approved
Temporary
Acceptance
449
179
100
41
21
Karaman
11
6
0
0
0
Konya
107
22
7
2
1
Energy Investments in Region
Konya Unlicensed Solar Applications
450
120
400
350
100
Number of
Nonpractising
Applications
27,72
Number of
Approved
Application
300
250
200
150
Konya Unlicensed Solar Applications
Number of
Evaluating
Applications
72,78
100
80
72,90
60
40
6,54
20
50
20,56
0
0
Total Applications
Approved Applications
Konya Unlicensed Solar Applications
7
6
5
57,14
4
3
14,29
2
1
28,57
0
Total Aproved Projects
Number of
Approved Project
Number of
Unapplied
Projects
Number of
Approved
Temporary
Acceptance
Number of
Application for
Temporary
Acceptance
Number of
Application for
Project
Energy Investments in Region
600
120,00
500
100,00
400
80,00
300
60,00
200
40,00
100
20,00
0
Number
Percentage
Konya
Karaman
TR-52
Turkey
120
78
198
496
24,19
15,73
39,92
100,00
For the number of Licensed Applications
Konya-Karaman is % 39,92
0,00
%
Number
Total Applications for Licensed Solar Energy
Energy Investments in Region
Total Applications for Unlicensed Solar Energy
600
100,00
500
80,00
Number
400
60,00
%
300
40,00
200
20,00
100
0
Number
Percentage
Konya
Karaman
TR-52
Turkey
107
11
118
567
18,87
1,94
20,81
100
For the number of Unlicensed Applications
Konya-Karaman is % 20,81
0,00
Energy Investments in Region
Total Applications for Licensed Solar Energy
9000
100,00
MW
7500
80,00
6000
60,00
%
4500
40,00
3000
20,00
1500
0
Konya
Karaman
TR-52
Turkey
Installed Capacity
1850
1117
2967
8900
Percentage
20,79
12,55
33,34
100,00
For the installed capacity of Licensed Applications
Konya-Karaman is % 33,34;
For the Allowed Licensed Capacity Konya-Karaman is
% 21,66; ( 130 MW / 600 MW )
0,00
Energy Investments in Region
Approved Applications for Unlicensed Solar Energy
100,00
200,00
80,00
MW
250,00
60,00
100,00
40,00
50,00
20,00
%
150,00
0,00
Konya
Karaman
TR-52
Turkey
Installed Capacity
42,18
4,80
46,98
203,60
Percentage
20,72
2,36
23,07
100
For the installed capacity of
Approved Unlicensed Applications
Konya-Karaman is % 23,07
0,00
Energy Investments in Region
TR52 Region Unlicensed Solar Applications by Years
400.000
350
350.000
300
300.000
250.000
kW
200
200.000
150
150.000
100
100.000
50
50.000
0
2013 (From April)
2014 ( From March )
0
700
Evaluating Installed Capacity
38.748
302.385
Approved Installed Capacity
0
46.278
Number of Approved Applications
0
116
Number of Evaluating Applications
100
332
0
2
Online Instaled Capacity
Number of Online Applications
Approved Installed Capacity
Evaluating Installed Capacity
Online Instaled Capacity
Number of Approved Applications
Number of Evaluating Applications
Number of Online Applications
0
Number of Plants
250
Energy Investments in Region
The Unlicensed Solar Applications by Power Stations
160.000,00
180
140.000,00
160
140
120.000,00
120
kW
100
80.000,00
80
60.000,00
60
40.000,00
40
20.000,00
20
0,00
0
Power Stations
Total Installed Capacity
Total Numbers
Number
100.000,00
Energy Investments in Region
Unlicensed
Unlicensed
Maximum Demand
Application
Application Number for 2013 Year (MW)
Installed Capacity
*
*
(kW) *
6.500
10
20,548
POWER STATION
CITY
NOMINAL POWER
(MVA)
1
AKŞEHİR
KONYA
25+25
2
ALAKOVA(GEÇİCİ)
KONYA
25
3
ALİBEYHÜYÜĞÜ
KONYA
50,(10+10)
9.997
13
4,196
4
ALTINEKİN
KONYA
100+16
8.500
10
4,412
5
BEYŞEHİR
KONYA
50+16
700
2
27,1
6
CİHANBEYLİ
KONYA
25+25
9.500
10
14,284
4.000
6
18,656
NUMBER
7
ÇUMRA
KONYA
50+50
8
DARAN(GEÇİCİ)
KARAMAN
50
7,88
9
EREĞLİ
KONYA
OTO TR(150), POWER TR(50+25)
3.500
7
35,412
10
ERMENEK(GEÇİCİ)
KARAMAN
125
500
1
7,964
11
GÜNEYSINIR
KONYA
100,(10+10)
44.250
52
7,7
12
ILGIN
KONYA
50
1.060
3
16,792
13
KARAMAN
KARAMAN
50+50
8.590
11
37,092
14
KARAMAN OSB.
KARAMAN
25+50
22.290
29
39,052
15
KARAPINAR
KONYA
50+50
18.924
45
16,464
16
KEPEZKAYA-HAVZA
KARAMAN
25
5.000
5
1,64
17
KIZÖREN
KONYA
100+50
9.508
11
6,368
18
KOLUKISA(GEÇİCİ)
KONYA
50
6.000
6
2,8
19
KONYA-1
KONYA
100+100+25
2.004
4
154,904
20
KONYA-2
KONYA
100+100
7.959
12
141,652
21
KONYA-3
KONYA
297
1
72,26
22
KONYA-4
KONYA
6.560
15
38,592
23
KULU
KONYA
100+100
OTO TR(2*250+250+150),
GÜÇ TR (100+50)
50
6.500
7
9,98
24
LADİK
KONYA
25+25
13.850
18
15,112
SEYDİŞEHİR
KONYA
OTO TR(180+180), POWER
TR(25+25)
2.000
4
20,164
26
YUNAK
KONYA
50+25
5,776
27
EVALUATED CONNECTION POINT
25
28
TOTAL
13.200
14
142.733
162
353.922
458
727
Energy Investments in Region
The Electrification and
Energy Generation Map of
TR52 Region
Energy Investments in Region
• Total Area 59.710.000 m² ( 5971 ha)
• 3.500 MW Installed Power Capacity ( 1 MW = 1,7 ha)
• 200 MW Energy Infrastructure ( Karapınar TM )
Karapınar Energy
Industry Zone
Characteristics
20 lt /sec using of process water,
Number 1 Zone has a distance to Karapınar – Konya Road 1,5 Km, Number 3 Zone is 18,5 Km,
Responsibility to waste-water plant,
Both of two area have %1 gradient value,
Both of two area are on 5. seismic zone
Energy Investments in Region
• Total Area 59.710.000 m² ( 5971 ha)
• 3.500 MW Installed Power Capacity ( 1 MW = 1,7 ha)
• 200 MW Energy Infrastructure ( Karapınar TM )
Karapınar Energy
Industry Zone
- There are 55 firms which have constracted measurement station for 60 licensed solar
power plant application.
- 45 company / person has applied for unlicensed solar power plants.
- Totally 90 firm has applied for 880 MW licensed or unlicensed solar power capacity
at KARAPINAR Energy Industry Zone
Energy Investments in Region
Investment Criteria
Location of Area
Karapınar Energy
Industry Zone
Climate
Charecteristics
Spatial Features of
the site
Parameter
Karapınar
Annual Total Sunshine Duration
2.964 hour / year
Annual Solar Radiation
2.100 kWh/m2year
Low atmospheric density
Open (02 okta)
Distance to Riverbeds
There is not river
Low air polution
Very low
Low wind potential
5,5 meter/sec/year
Arid climate
Semi arid, Cold
Low Humidity
%21
Distance to Sea
265 km/Akdeniz
Low air temperature
11,83 C°
Inclined terrain
1,5 °
Land without the risk of
earthquakes
Land has not been protected by
law
Non forest land
5. Degree
Non agriculture land
Yes
Non pasture land
Yes
Railway, highway land not
exceeding
Not close to the airport land
Yes
Yes
Yes
110 km
Energy Investments in Region
Investment Criteria
Spatial Features of
the site
Karapınar Energy
Industry Zone
Others
Parameter
Karapınar
Military exercises in the field, away
from the land
Away from the urban area of land
Enough distance
Away from the main roads and the
coastal strip of land
Yes
Land is not lookup field for mining
or oil
Distance to Altitudes
Yes
The land away from the direction
of bird migration
Obstacle to investment license
Enough distance
Yes
Enough Distance
Tax Incentives ın Industrial Zones
There is no obstacle to invesment
license
100 MVA Transformer and
200 MW Transmission Capacity
Customs Duty Exemption,
VAT Exemption,
Land Allocation,
Social Security Premium Support
(Employee’s Share) ,
Tax Reduction
Working
Qualified Human Resources
52 person/m2,
Transformers and Transmission
Constraints
Incentives
Energy Investments in Region
Council of
ministers
decision
Karapınar Energy
Industry Zone
Transfer of
Land to
Investors
Removing
attribute of
pasture
Transfer of land
to the Ministry
of Industry
Infrastructure
Studies
Parcelization
Studies
Geological
Studies
Briefly Energy Law in Turkey
Law
Renewable Energy Law, Law no 5346
Energy Market Law, Law no 4628
Secondary
Regulation
EMRA Board
Decisions
Announcements
of Energy
Ministry
Regulation for Solar Power Plants (19.06.2011/27969)
Competition for Grid Connection Rights Regulation
(29.05.2012/28307)
Pre-licence Measurement Regulation (22.02.2012/28212)
Support Mechanism (YEKDEM) Regulation
(21.07.2011/28001)
Regulation for Local Equipment Bonus (19.06.2012/27969)
Unlicenced Generation Regulation (21.07.2011/28001)
Licence Regulation (4.8.2002/24836)
Announcement on Grid connection
capacities
Announcement on licence applications
acceptance dates
Briefly Energy Law in Turkey
Renewable Energy Production
For Commercial
Sell to YEKDEM-EPIAS-Own Costumer
For Own Using
Unlicensed
Licensed
Unlicensed
< 1 MW
> 1 MW
No Limit
Sell to YEKDEM
Sell to YEKDEM-EPIAS-Own Costumer
For Own Using
Solar PP
Solar PP
0,133 USD/kWh
0,133 USD/kWh
Wind PP
Wind PP
0,073 USD/kWh
0,073 USD/kWh
Biogas PP
Biogas PP
0,133 USD/kWh
0,133 USD/kWh
Hydroelectric PP
Hydroelectric PP
Co-generation or
0,073 USD/kWh
0,073 USD/kWh
Tri-generation PP
Jeotermal PP
Jeotermal PP
0,105 USD/kWh
0,105 USD/kWh
Solar PP
Wind PP
Biogas PP
Briefly Energy Law in Turkey
0,83
1,33
1,50
1,50
1,17
The Ratios of License Capacity
0,50
1,50
1,50
1,83
1,83
21,67
2,67
3,00
3,00
3,33
3,50
12,83
3,67
4,17
4,33
9,67
4,33
4,50
100.000
5,83
Konya, Karaman
Van, Ağrı
Antalya 1,2
Mersin
K.Maraş, Adıyaman
Burdur
Niğde, Nevşehir, Aksaray
Kayseri
Malatya, Adıyaman
Hakkari
Muğla, Aydın
Isparta, Afyon
Denizli
Bitlis
Bingöl, Tunceli
Şırnak
Adana, Osmaniye
Muş
Siirt, Batman, Mardin
Sivas
Elazığ
Şanlıurfa, Diyarbakır
Erzurum
Erzincan
When based on
the percentage
of capacity, it is
supposed to be
given license to
888 MW
according to
2023 energy
projection in our
region
•Electrical Energy Markets and Supply Security Strategy Paper target installed capacity of 100,000 MW by the year
2023,
MW
30.000
MW
4.700
MW
•The document in question at least 30% of total installed capacity in 2023, renewable energy,
•Target of 20,000 MW of installed wind power in 2023, the installed capacity target of 600 MW of geothermal,
•Solar and geothermal energy target for 2023, a total of 9,400 MW,
•When Solar and Geothermal sharing is made of 50% for 2023, the solar power target is 4,700 MW
Briefly Energy Law in Turkey
Locally Produced Component
Bonus
(USDcent/kWh)
Bonus
(EUROcent/kWh)
13,3
9,67
0,8
0,58
1,3
3,5
0,6
0,5
6,7
20
0,95
2,55
0,44
0,36
4,87
14,54
13,3
2,4
0,6
0,6
1,3
2,4
1,3
0,6
9,2
22,5
9,67
1,75
0,44
0,44
0,95
1,75
0,95
0,44
6,69
16,36
Solar PV
The Base Tariff
PV Panel Integration and Production of Structural solar
mechanics
PV Modules
PV Module Cells
Invertor
Metarial that focuses radiation on the PV Module
TOTAL Bonus
TOTAL Tariff
Concentrated Solar
The Base Tariff
Radiation collector tube
Reflective surface
Sun tracking system
Mechanical components of heat
Mechanical components of the steam generation system
Stirling engine
Panel integration and production of structural solar mechanics
TOTAL Bonus
TOTAL Tariff
Briefly Energy Law in Turkey
Some Problems for Invesments
Before Application Phase
The absence of differences between the procedure of 1 KW and 1MW
There is not a standart application procedure between Distribution
Companies
Alternative Connection Points Are not Showing
On Application Phase
The Approvals of Distribution Companies are not on time
Differences in practice between Distribution Companies
GES compliance letter
On Project Phase
Static Project Approval
Modification of Construction Plan
Solar Industry
PV Panel and Components Trade of Turkey
$30.000.000
180,00
$25.000.000
160,00
$20.000.000
140,00
$15.000.000
120,00
$10.000.000
100,00
$5.000.000
$0
80,00
-$5.000.000
60,00
-$10.000.000
40,00
-$15.000.000
20,00
-$20.000.000
0,00
-$25.000.000
-$30.000.000
2009
2010
2011
2012
2013
2014
Import Value ($)
7.136.612
10.794.090
13.633.989
12.051.407
30.428.232
6.632.588
Export Value ($)
1.160.439
5.444.858
8.477.984
2.334.409
1.842.029
471.513
Trade Balance ($)
-5.976.173
-5.349.232
-5.156.005
-9.716.998
-28.586.203
-6.161.075
51,25
26,31
-11,61
152,49
30,78
Import Annual Growth (%)
Total Import 80.676.918 $
Total Export 19.731.232 $
-20,00
Import Average Growth %49,84
Export Average Growth %76,99
Solar Industry
Top 5 Exporter Countries to Turkey, 2009
40,00
37,00
Top 5 Exporter Countries to Turkey, 2010
30,00
35,00
25,00
30,00
23,61
25,00
20,00
15,23
14,86
15,86
15,71
15,00
11,06
10,00
10,00
4,89
4,41
India
Spain
5,00
0,00
8,60
5,00
0,00
China
Germany
USA
Others
China
Top 5 Exporter Countries to Turkey, 2011
31,98
Greece
Taiwan
Germany
Others
USA
Top 5 Exporter Countries to Turkey,2012
60,00
28,57
53,65
50,00
21,87
40,00
30,00
8,74
China
Taiwan Germany Others
5,83
USA
3,01
India
62,85
50,00
10,14
9,82
Taiwan
Others
10,00
4,62
4,43
USA
Japan
0,00
China
Germany
Top 5 Exporter Countries to Turkey,2014
80,00
60,00
17,34
20,00
Top 5 Exporter Countries to Turkey,2013
70,00
24,19
20,00
15,00
35,00
30,00
25,00
20,00
15,00
10,00
5,00
0,00
24,57
68,96
60,00
40,00
40,00
30,00
16,41
20,00
8,16
10,00
5,42
4,10
3,06
0,00
China
Germany Others
Taiwan
South
Korea
Italy
15,07
20,00
6,62
5,84
3,33
0,18
Others
Italy
0,00
China
Singapore Malaysia Germany
Solar Industry
Years
Number of
Price for 250 W Price per Watt Price per Watt
Capacity (KW)
Panel
($)
($)
(Euro)
2009
10.746
2.687
664
2,66
1,92
2010
10.942
2.736
986
3,95
2,85
2011
23.523
5.881
580
2,32
1,68
2012
54.744
13.686
220
0,88
0,64
2013
139.729
34.932
218
0,87
0,63
2014
27.953
6.988
237
0,95
0,69
TOTAL
267.637
66.909
301
1,21
0,87
For China Price per Watt 0,62 Euro
For Germany Price per Watt 0,84 Euro
Industry Competation Analysis
Distribution of the main industry in our region, 2009
Criteria
Main Sectors
Agriculture, Forestry, Fishing
Mining
Manufacturing
Number of
Workplaces
Employment
Endorsement Salary+Charge Investments
TR
TR52
TR
TR52
TR
TR52
TR
TR52
TR
TR52
0,01
0,09
0,02
0,03
0,01
0,12
0,02
0,04
0,03
0,00
0,14
0,14
1,09
0,99
0,82
0,57
2,06
1,15
1,83
1,53
13,08 14,26 27,11 29,15 27,34 27,71 34,93 38,85 35,14 43,32
Electricity, Gas, Steam
0,03
0,01
0,65
0,33
4,63
2,56
2,20
2,28
5,20
2,30
Water, Sewer
0,12
0,30
0,72
1,26
0,46
0,59
1,48
3,33
1,46
5,23
Construction
4,49
2,81
7,16
4,40
6,03
2,74
5,62
4,23
5,46
5,28
Trade And Repair
42,87 49,25 29,23 38,14 46,13 56,29 19,89 25,83 15,86 20,55
Transport, Storage And Communication
15,86 15,39
9,71
8,80
5,84
5,94
9,10
7,20
15,38 15,30
Hotels, Restaurants, Etc.
8,17
5,89
6,53
3,75
1,64
0,70
4,11
1,98
2,82
Information And Communication
1,06
1,15
1,51
0,90
2,14
0,43
4,41
2,70 11,68 0,93
0,78
0,43
0,41
0,19
0,20
0,22
0,31
0,08
0,34
0,00
5,04
3,63
3,72
2,55
1,98
0,53
3,87
1,66
1,35
0,65
0,97
0,50
5,90
3,67
1,40
0,60
5,83
5,00
1,11
0,32
Education
0,44
0,47
1,77
2,04
0,37
0,26
2,53
2,49
0,90
1,12
Health And Social Services
1,27
0,61
1,99
1,59
0,65
0,52
2,79
2,91
1,19
2,78
Culture, Arts, Sports, Entertainment
0,57
0,27
0,36
0,12
0,16
0,01
0,36
0,02
0,15
0,01
Other Services
5,11
4,79
2,11
2,10
0,19
0,20
0,48
0,24
0,10
0,06
Other / Unallocated
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,06
Real Estate, Renting And Business
Activities
Professional, Scientific, Technical
Operations
Administrative And Support Services
Total
0,55
100,00 100,00 100,00 100,00 100,00 100,00 100,00 100,00 100,00 100,00
Industry Competation Analysis
Distribution of Manufacturing Industry in our region,2009
Criteria
Number of
Workplaces
Employment
Endorsement
Salary+Charge
Investments
Sectors
TR
TR52
TR
TR52
TR
TR52
TR
TR52
TR
TR52
10-Food
11-Drink
13-Textile
14-Wearing Apparel
15-Leather And Products
16-Wood, Wood Products
17-Paper And Paper Products
18-Printed Publication
20-Chemical Products
21-Basic Pharmaceutical
22-Rubber & Plastic
23-Mineral Products
24-Base Metal
25-Metal Furniture
27-Electrical Equipment
28-Machinery And Equipment
29-Manufacture Of Motor
Vehicles, Etc.
30-Other Transport
Equipment
31-Furniture
32-Other Manufacturing
33-Installation, Repair
Other / Unallocated
Manufacturing Industry
12,96
11,27
13,03
30,26
15,10
53,94
12,60
44,26
10,36
30,20
0,18
0,06
0,46
0,30
1,08
0,41
0,80
0,88
1,11
0,00
5,82
4,65
10,98
1,65
7,68
0,99
8,48
0,81
6,38
1,47
16,05
7,64
14,70
5,30
6,64
1,75
8,93
3,55
3,45
0,94
2,33
5,41
1,69
2,24
0,85
0,69
0,95
0,83
0,46
0,12
8,14
6,93
2,63
2,57
1,41
0,56
1,08
1,17
1,21
0,82
0,72
0,33
1,55
1,31
2,00
2,19
1,94
1,55
1,75
1,83
3,97
1,87
2,08
0,93
1,09
0,29
1,49
0,49
0,66
0,35
1,19
1,12
2,21
1,66
5,37
1,97
4,16
1,60
3,62
0,00
0,12
0,10
1,14
0,49
2,03
0,40
4,09
2,19
0,99
0,36
5,81
11,11
5,61
7,91
5,01
6,07
5,34
5,48
4,99
19,29
4,14
4,23
6,07
3,86
5,67
4,60
6,56
4,18
8,14
5,51
0,76
1,78
3,67
5,18
10,07
5,84
6,40
5,94
31,12
8,67
14,86
18,64
8,79
9,05
5,14
4,25
6,53
5,20
4,24
5,41
2,31
0,77
3,96
0,73
5,99
0,56
6,01
0,52
3,27
0,82
3,98
5,84
5,15
10,14
3,63
7,73
4,96
10,03
3,84
10,95
1,41
7,10
4,84
11,10
8,37
5,96
7,95
8,57
5,42
10,37
0,35
0,05
1,42
0,04
1,39
0,02
2,37
0,02
1,84
0,00
10,53
8,36
5,16
3,96
1,99
1,23
2,61
2,02
1,09
1,53
2,41
1,22
1,79
0,97
2,11
0,38
1,24
0,59
0,60
0,00
1,71
1,49
1,28
0,28
0,54
0,04
1,43
0,05
0,63
0,00
0,27
0,04
1,80
0,08
6,85
0,11
4,07
0,06
4,83
1,33
100,00
100,00
100,00
100,00
100,00
100,00
100,00
100,00 100,00 100,00
Industry Competation Analysis
Sectoral Distribution of Investments
2003
Period
Main Sectors / Regions
TR
2009
TR52
TR
TR52
0,8
0,3
1,5
0,6
Manufacturing
41,7
65,5
35,7
47,9
Electricity
13,6
4,7
8,3
12,8
3,3
1,3
7,2
3,7
10,8
14,7
16,0
18,6
4,3
1,9
3,2
0,6
15,4
5,6
21,2
9,4
Real Estate, Renting And Business Activities
4,0
1,1
3,6
3,7
Education
3,0
0,5
1,0
0,6
Other / Unallocated
3,1
4,3
2,2
2,0
100,0
100,0
100,0
100,0
Mining
Construction
Trade And Repair
Hotels, Restaurants, Etc.
Transport, Storage And Communication
Total
Industry Competation Analysis
TR52 Relative Shares Index,2009 – ( For Turkey 100 )
NACE Sectors
Number of
Workplace
Employment Endorsement Salary+Charge Investments
10-Food
87
232,3
357,2
351,3
291,6
11-Drink
31,2
65,9
37,7
108,9
0
13-Textile
80
15
13
9,6
23,1
14-Wearing Apparel
47,6
36,1
26,4
39,7
27,4
15-Leather and Products
232,2
132,2
81,7
87,3
25,8
16-Wood, wood products
85
97,4
39,9
108,3
68,3
17-Paper and Paper Products
46
84,1
109,3
79,7
104,6
18-Printed Publication
47,1
44,9
26,8
33
53,2
20-Chemical Products
94
75
36,7
38,4
0
21-Basic Pharmaceutical
87,2
42,7
19,6
53,7
36,2
22-Rubber & Plastic
191,3
140,8
121,2
102,8
386,8
23-Mineral Products
102,1
63,6
81,2
63,7
67,7
24-Base Metal
234,8
125,5
141,3
103
58
92,8
27,9
82,9
79,6
127,7
33,3
18,4
9,4
8,7
25,1
146,9
503,8
196,9
229,2
213,2
71,2
202,1
107,7
285,4
191,3
30-Other Transport Equipment
13,3
2,7
1,4
1
0,2
31-Furniture
79,4
76,7
61,7
77,4
140,5
32-Other Manufacturing
50,7
54,1
17,8
48
0
87
22,3
6,8
3,1
0,7
25-Metal Furniture
27-Electrical Equipment
28-Machinery and Equipment
29-Manufacture of motor vehicles, etc.
33-Installation, Repair
Industry Competation Analysis
Levels and Distribution of Technology in Manufacturing Industry (%)
Turkey
Low Technology Sectors
Low-Middle Technology Sectors
Middle-High Technology Sectors
High Technology Sectors
TR52
Low Technology Sectors
Low-Middle Technology Sectors
Middle-High Technology Sectors
High Technology Sectors
Number of
Employment Endorsement Salary&Charge
Workplace
62,46
54,12
41,88
37,32
25,03
23,44
24,79
34,24
12,38
21,71
31,91
26,97
0,12
0,7
1,4
1,32
Number of
Employment Endorsement Salary&Charge
Workplace
44,7
47,2
55,9
57,2
34,8
26,8
20,5
22,7
20,5
25,7
23,3
19,5
0
0
0
0
Investments
27,99
40,76
30,49
0,72
Investments
43,3
39,9
16,6
0
Industry Competation Analysis
TR52 Region Foreign Trade Breakdown by Sectors, 2012
Thousand USD
Export Export Share (%)
Import
Import Share (%)
X-M
Agriculture (Agriculture, Livestock, Fisheries and Forestry)
91.646,00
Mining, Quarrying
9.024,00
Manufacturing Industry
1.450.168,00
Other (Junk, Entertainment, Sports activities)
3.777,00
5,90
0,60
93,30
0,20
230.841,00
2.858,00
995.804,00
47.600,00
18,10
0,20
78,00
3,70
-139,20
6,17
454,36
-43,82
1.554.615
100
1.277.103
100
277.512
TR52 Konya-Karaman
Technology Scores of Exports by Regions, 2012
Technology Scores of Imports by Regions, 2012
3,5
3,5
3,0
3,0
2,5
2,5
2,0
2,0
1,5
1,5
1,0
1,0
0,5
0,5
TRA2
TRB2
TR22
TRC3
TR72
TR90
TR61
TR83
TR52
Konya
TR10
TR71
TR42
TR82
0,0
TR33
Karaman
TRC1
TR82
TR32
TR22
TR21
TRC2
TRA2
TRA1
TR83
TR
TR52
Konya
TR41
TR33
0,0
8,0
7,0
6,0
5,0
4,0
3,0
2,0
1,0
0,0
23-Kok Kömürü, Rafine…
18-Giyim
35-Diğer Ulaşım Araçları
19-Deri ürünleri
22-Basım ve Yayım
17-Tekstil
30-Büro,Bilgi İşlem…
Specialization of Imports for Konya, 2012
23-Kok Kömürü, Rafine…
18-Giyim
35-Diğer Ulaşım Araçları
19-Deri ürünleri
17-Tekstil
22-Basım ve Yayım
30-Büro,Bilgi İşlem…
31-Elektrikli Mekina ve…
32-Radyo, TV, Haber. Teç.
27-Ana Metal
14-Taşocakçılığı
20-Ağaç ve Mantar
13-Metal Cevherleri
33-Tıbbi Aletler
36-Mobilya
21-Kağıt
10-Maden Kömürü
24-Kimyasal Ürünler
26-Mineral Ürünler
25-Plastik&Kauçuk
2-Ormancılık
28-Metal Eşya
34-Motorlu Kara Taşıtı
1-Tarım ve Hayvancılık
29-Makine ve Teçhizat
15-Gıda ve İçecek
0,0
31-Elektrikli Mekina ve…
32-Radyo, TV, Haber. Teç.
20-Ağaç ve Mantar
27-Ana Metal
14-Taşocakçılığı
13-Metal Cevherleri
33-Tıbbi Aletler
36-Mobilya
21-Kağıt
10-Maden Kömürü
24-Kimyasal Ürünler
26-Mineral Ürünler
25-Plastik&Kauçuk
2-Ormancılık
28-Metal Eşya
1-Tarım ve Hayvancılık
34-Motorlu Kara Taşıtı
15-Gıda ve İçecek
29-Makine ve Teçhizat
Industry Competation Analysis
Specialization of Exports for TR52, 2012
6,0
4,0
2,0
Energy Industry in our Region
The firms which can be work about solar industry
• Solimpeks
• Derya Güneş Kollektör
• Bağdaş Alüminyum
• EEM Mühendislik
Photovoltaic Panel
• Heray Güneş
• Kamer Elektrik
• Sunstrip
• Anıtcam
• Akdeniz Cam
• Çıraylar Cam
• AYD
• Endüstriyel Elektronik
• Derya Güneş Kolektörü
EVA
Energy Industry in our Region
The firms which can be work about solar industry
Metal Support
Glass
• Acar MPG Makine
• Hidrokon
• Has Pompa
• Betokav
• AYD
• Isıl Çelik Döküm
• Telefoncular
• Derya Güneş Kolektör
• Kondöksan
• Üçel Paslanmaz Çelik
• Gülmez Makine
• Bağdaş Alüminyum
• AF Enerji
• Derya Güneş Kolektör
• Akdeniz Cam
• Çıraylar Cam
• Konkar Cam
Energy Industry in our Region
The firms which can be work about solar industry
Solar Tracking
System
• Erdirenler Dişli
• OSR Robotics
• Hidrokon
• Has Pompa
• Anka Kalıp
• AYD
• Hidrosur
• Telefoncular
• Derya Güneş Kolektör
• Yasinoğulları
• Tavşan Saç
• Solimpeks
• Hantaş
• Zafer Dişli
• Şalt Otomasyon
• Samur Elektrik
• Özsamur Elektronik
• EEM Mühendislik
• Endüstriyel Elektrik Elektronik
• Konya Enerji
Energy Industry in our Region
The firms which can be work about solar industry
Battery and
The Gel
Connection
Equipments
• Has Pompa
• Makkon Mühendislik
• Derman Akü
• Aktif Akü
• Öztürk Akü
• EEM Mühendislik
• Samur Elektrik
• BAF Enerji
• Atiker Metal
• Şalt Otomasyon
Energy Industry in our Region
The firms which can be work about solar industry
Electronic Control
Systems
• Erdirenler Dişli
• OSR Robotics
• Hidrokon
• Has Pompa
• Anka Kalıp
• AYD
• Hidrosur
• Telefoncular
• Derya Güneş Kolektör
• Yasinoğulları
• Tavşan Saç
• Solimpeks
• Hantaş
• Zafer Dişli
• Şalt Otomasyon
• Samur Elektrik
• Özsamur Elektronik
• EEM Mühendislik
• Endüstriyel Elektrik Elektronik
• Konya Enerji
Energy Industry in our Region
The firms which can be work about solar industry
Charge Control
• EEM Mühendislik
• Samur Elektronik
• Konya Enerji
• BAF Enerji
• Atiker Metal
• Has Pompa
• Şalt Otomasyon
Electric Metering
• Samur Elektronik
• EEM Mühendislik
Energy Industry in our Region
The firms which can be work about solar industry
Connected
Equipments
• ACAR MPG Makine
• Konya Metalurji
• AYD
• Telefoncular
• Derya Güneş Kolektör
• Akkaya Isı
• Bilir Metalurji
• Yıldız Pul
• Üçel Paslanmaz Çelik
• Gülmez Makine
• Bağdaş Alüminyum
• BAF Enerji
• Hidrosan
• Samur Elektronik
• Kamer Elektrik
• Heray Güneş
• Solimpeks
• Konya Enerji
• Montaş
• Mor Çelik
Energy Industry in our Region
The firms which can be work about solar industry
Cables
• Lukas
• Derya Güneş
• Nirvana Elektronik
• Üçel Paslanmaz
• Bağdaş Alüminyum
• Hidrosan
• Samur Elektronik
• Solimpeks
• BAF Enerji
• Kamer Elektrik
• Heray Güneş
• Konya Enerji
What MEVKA made
Energy Sector Ratio for Applications to MEVKA Grants
120,00
97,46
98,31
97,24
100,00
94,37
100,00
87,13
%
80,00
60,00
40,00
20,00
0,00
2008
2,54
1,69
2,76
5,63
2009
2010
2011
2012
Other Sector Applications
12,87
0,00
2013
2014
Energy Sector Applications
The Ratio of Energy Sector for Granted Project Numbers
120,00
100,00
96,55
98,39
97,03
3,45
1,61
2,97
2009
2010
2011
100,00
91,24
%
80,00
60,00
40,00
20,00
0,00
2008
Granted Projects for Other Sectors
8,76
0,00
2012
Granted Projects for Energy Sector
2013
What MEVKA made
The Ratio of Energy Sector Projects
Requested/Granted Ratios by
Sectors
120,00
100,00
25,00
23,65
20,00
60,00
97,53
96,61
17,67
15,00
40,00
%
%
80,00
20,00
10,00
3,39
2,47
Total Project
Applications
Granted Projects
Other Sectors
97,53
96,61
Energy Sector
2,47
3,39
0,00
Total Project Application Number
Energy Sector Project Application Number
Granted Project Number
Granted Energy Sector Project Number
Requested Amount for Total Applications ( TL )
Requested Amount for Energy Applications ( TL )
Total Granted Amount
Granted Amount for Energy Sector
5,00
0,00
Energy Sector
Other Sectors
TOTAL
2.594
64
738
25
391.586.971,93 TL
16.796.189,37 TL
70.209.512,55 TL
3.972.598,31 TL
What MEVKA planning to do?
Investment Consultancy Support
Feasibility
Studies
Sectoral Database
• PV Panel Production Feasibility Studies
• Nuclear Industry Feasibility Studies
• To make data up to date
• Coordination with sectoral institutions
(TEİAŞ, MEDAŞ )
What MEVKA planning to do?
Energy efficiency
Call for Proposals
• In our call for proposal we will
prioritize increasing Energy
Efficiency in enterprises
• In social projects projects on
increasing awareness for
energy efficiency will be
prioritized.
What MEVKA planning to do?
Renewable and Nuclear Energy
• Using Renewable Energy
Sources,
• Production and
Call for Proposals exportation of renewable
and nuclear energy
technologies on R&D
basis
Contact
Specialist of Energy
Mücahit Yasir KINALI
Electric-Electronic Engineer
[email protected]
90 554 551 62 76
Konya Investment Support
Office
Karaman Investment Support
Office
[email protected]
[email protected]
Tel : 90332 236 32 90
Tel : 90338 213 00 20
Medrese Mahallesi Ulaşbaba Caddesi
No:28 Selçuklu/KONYA Türkiye 42060
İmaret Mahallesi Atatürk Bulvarı No:2
Merkez/KARAMAN Türkiye 70100
Download

Energy Potential of the Region