ISTROENERGO GROUP, a.s.
General contractor of power engineering, ecological and
metallurgical technologies on „turn key“ form.
Contractor of complex basic and detail engineering activities of
power engineering, manufacture, erection, commissioning and
services.
REFERENCE LIST
OF COMPANY
© April 2010
ISTROENERGO GROUP, a.s.
 934 01 Levice, Rozmarínová 4, Slovakia
+421 (0)36 6376 111, FAX +421 (0)36 6227 249
E-mail: [email protected] www.ieg.sk
I. TURN KEY DELIVERIES
POWER ENGINEERING
Item
Customer / Site
Subject
Start Up
Year
1
IDEA a.s.
NITRA
Reconstruction of boiler - fuel: scobs 100% wood waste 100%;
4 t/hr; 1,32 MPa; 220 °C
10/92
2
LEVICKÉ MLIEKÁRNE a.s.
LEVICE
Increasing of OKP 16 boiler efficiency to
94 %; 16 t/hr; 1,86 MPa; 220 °C
12/92
3
HARMANECKÉ PAPIERNE a.s.
HARMANEC
Gasification of boiler - fuel: natural gas 100%; Oil 100%;
35 t/hr; 3,73 MPa; 445 °C
9/93
4
FORTUNAE s.r.o.
LEVICE
Increasing of Duro Dakovic boilers efficiency;
25 t/hr; 1,32 MPa; 204 °C
3/94
5
PK a.s.
TREBIŠOV
Increasing of OKP 16 boiler efficiency to 94%
16 t/hr; 1,32 MPa; 220 °C
8/94
6
PEČIVÁRNE s.r.o.
SEREĎ
Boiler house – fuel: natural gas 100%;
6 t/hr; 0,6 MPa;176 °C
10/94
7
ŽELEZIARNE a.s. PODBREZOVÁ
Increasing of OKP 25 boiler efficiency to 94%
25 t/hr; 1,32 MPa; 220 °C
10/94
8
TŽ a.s. TŘINEC
Czech Republic
Equipment for liquidation of fly ash behind CFB
160 t/hr of steam
11/94
9
ZSE š.p.
BRATISLAVA
Delivery of heat exchange station; 32 MWt
11/94
10
SLOVNAFT a.s.
BRATISLAVA
Reconstruction of burners and control system of boilers;
140 t/hr; 13,6 MPa; 540 °C
11/94
11
HARMANECKÉ PAPIERNE a.s.
HARMANEC
Reconstruction of heat exchange station; 11 MW t
12/94
12
ČEZ a.s. HEATING PLANT NÁCHOD a.s.
Czech Republic
Emission reduction of lignitic coal fired boiler and exchange of control
system - fuel: lignitic coal, natural gas, mazut; 75 t/hr; 9,6 MPa; 540 °C
10/95
13
BIOTIKA a.s.
SLOVENSKÁ ĽUPČA
Cogeneration plant;
4 MWe ; 25 t/hr; 0,6 MPa; 200 °C
11/95
14
SLK a.s.
TRENČIANSKE TEPLICE
Delivery and erection of steam boiler;
12 t/hr; 1,45 MPa; 220 °C
3/96
15
SCP a.s.
RUŽOMBEROK
Delivery of the precipitator for soda boiler; 180 t/hr
9/96
16
DEZA, a.s.
VALAŠSKÉ MEZIŘÍČÍ
Czech Republic
Reconstruction of HRSG boiler ;
64t/hr. 4.61 MPa, 410°C
9/96
17
LEVITEX a.s.
LEVICE
Gasification of boilers K2, K3, control system, gas pipe;
50 t/hr; 3,9 MPa; 445 °C
10/96
18
MST a.s. OSTRAVA
Tp OSTRAVA
Czech Republic
Emission reduction of bituminous coal, coke-oven gas fired boiler and
exchange of control system;
75 t/hr; 7,65 MPa; 485°C
10/96
19
ČEZ a.s. Tp DVŮR KRÁLOVÉ
Czech Republic
Emission reduction of lignitic coal fired boiler and exchange of control
system - fuel: lignitic coal, natural gas; 75 t/hr; 9,6 MPa; 540°C
10/96
20
MST a.s. OSTRAVA
Tp OSTRAVA
Czech Republic
Reconstruction of general repair K4;
75 t/hr; 7,65 MPa; 485°C
10/96
21
VSŽ a.s. KOŠICE Tp.
Refurbishment of boiler K3 combined burners
11/96
215 t/hr; 9,42 MPa; 540°C
Reference list
Sheet No 2
Item
Customer / Site
Subject
Start Up
Year
22
KRPA a.s. HOSTINNÉ
Czech Republic
Cogeneration unit 2x4,5 MWe ; +53 t/hr; 6,5 MPa; 490°C
12/96
23
MST a.s. OSTRAVA Tp PŘÍVOZ
Czech Republic
Reconstruction of general repair K3,
75 t/hr; 7,65 MPa; 485°C
10/97
24
SLOVAKOPRESS
Electrical adapter distributors
3/97
25
MST a.s. OSTRAVA Tp PŘÍVOZ
Czech Republic
Reconstruction of general repair K2, K5
75 t/hr; 7,65 MPa; 485°C
11/98
26
KOVOHUTY KROMPACHY a.s.
Intensification of Cu concentrates processing-KFP;
20 kt/year
12/98
27
SCP a.s.
RUŽOMBEROK
28
SCP a.s.
RUŽOMBEROK
SCP a.s.
RUŽOMBEROK
29
Reconstruction of two electrostatic filter behind
180 t/hr boiler
Combined cycle power plant
2x14 - 17 MWe + 2x60 t/hr of steam,
6,28 MPa, 465°C + 20MWe
- Modification of NCG gases before combustion and
modification of MoDo incinerator for assurance of continual
operation
- Reconstruction of reduction stations, boiler feeding,
modification of heating system
- Reconstruction of bark boiler - 120 t/hr - fluidization
- Modernization of TG 20 MW
- Modernization of control system for TG 10 MW, higher level
of control, replacement of transformers, electric output for CC – power
plant
Reconstruction of power plant using boilers with
combustion of waste wood
10/97
9/98
6/98
8/97
10/97
10/98
10/98
10/98
30
SPARTAN a.s.
TRNAVA
31
ZSNP a.s.
ŽIAR nad HRONOM
New Burners Delivery
10/98
32
DUSLO a.s.
Šaľa
Boiler reconstruction from subbituminous coal to natural gas;
125 t/hr; 9,41 MPa; 540°C of steam
11/98
33
POĽNOBANKA a.s.
Transformation station 22/0,4 kV - Krížna street
9/98-1/99
34
BUDIMEX S.A. WARSZAW
Poland
Heat Recovery Steam Generator, 15 t/hr of steam for
municipal solid waste incineration plant in Warszawa
12/99
35
ESMO MOHELNICE s.r.o.
Czech Republic
Cogeneration Plant 4 MW e + 14 t/hr of steam
3/2000
36
SCP a.s.
RUŽOMBEROK
Separate Treatment of CNCG from Stripper
1/2000
37
ŽELEZIARNE PODBREZOVÁ a.s.
Cogeneration Plant 1 x 4 MWe + 14 t/hr of steam
11/2000
38
SSE Žilina
TP Zvolen
Dry Ash withdrawal
12/2001
39
ŽP, a.s. Podbrezová
Water heater reconstruction
12/2001
39
D &D Miškolc
Hungary
Energy Plant modernization
1/2002
40
AK ENERJI - IZMIR BATICIM
Turkey
Cogeneration Power Plant 43 MWe total power output
6 x GT Typhon 5,2 MWe + 2 x HRSG dual pressure
(3 x GT to one HRSG) + 1 x ST 16 MWe
2/2002
Reference list
9/99
Sheet No 3
Start Up
Year
Item
Customer / Site
Subject
41
AKEL YALOVA, YALOVA
Turkey
CCPP plant
Gas turbine : 2x F9E, 130 MW
HRSG : 2 x tripple pressure
Steam Turbine : 2 x 60 MW Combined cycle : 360 MW Cogenartion mode :
310 MW + 240 t/h steam extraction
2/2003
42
SH ENERGO, a.s. Senica
New energetic source SH, a.s., Senica
5/2003
43
PEC Wyszków
Poland
Waste Heat Hot Water Boiler 1 x 4,3 MWt
for Cogeneration Plant PEC Wyszków
7/2003
44
NUH ENERJI – ISTANBUL
Turkey
Cogeneration Plant 59 MW e of total power output
2 x GT GE 48,8 MWe + 2 x HRSG dual pressure + 1 x ST 26 MWe
11/2003
45
IPO OBERBRUCH
Germany
Delivery and assembly of
Heat Recovery Steam Boiler 44,5 t/hr;510°C; 58bara of steam with
supplementary firing behind the Gas Turbine Titan 130
8/2005
46
TOPLOFIKACIA PLEVEN
Bulgaria
Cogeneration Unit with GTG LM 2500 32,5 MWe + HRSG 73t/hr. With
supplementary firing, 440°C; 39 barg,
Control system, and electro part
5/2006
47
TEKO Košice
Slovakia
48
PST for AB PANAVEŽIO
Lithuania - Panevezio
49
SE a,s. Bratislava
JASLOVSKÉ BOHUNICE
Slovakia
Standby heating Plant 3 x 30 t/hr. Of steam with accessories „on key“ form
On base of contract BIDSF 0031009-A5B2/IEG-PMU
5/2005
8/2006
50
RUDESHUR
Iran
Delivery of Power Plant on base of GTGs 750 MW – Phase I.
RUDESHUR SCPP 750 MW - Lot 2.2 Oil system
RUDESHUR SCPP 750 MW - Lot 2.4 Instrumentation and Service
RUDESHUR SCPP 750 MW - Lot 2.5 Water and waste water
8/2006
51
ET Třinec
Czech republic
Installation of new boiler for metallurgy gases of power 80 t/hr.
12/2005
12/2006
DOW BENELUX, B.V. Terneuzen
Belgium
Delivery of
Heat Recovery Steam Boiler 46 t/hr of steam, 394°C; 35 bara,
behind the Gas Turbine
53
BOHUNICE 2
Slovakia
Changes of Heat distribution inside of EBO Plant – J.Bohunice
2007
54
ŠČERBINKA Moscow
Russia
2 x HRSG behind the FRAME P gas turbine
2007
55
TAKENAKA
Building of Hyunday Nošovice
2007
56
TP Panevezio Panevezio
Lithuania
Heat Recovery Steam Generator, 40 t/hr; 4.5 MPa; 450°C EPC Contractor
1 x Siemens GT 600 - 32 MW
2/2008
57
MORDOVCEMENT
Komsomolsk/Saransk Russia
Combined Cycle Power Plant 70 MW
2 x GTG LM 2500+ G4 +1 x HRSG + 1 x STG One GTG
for direct dry of cement technology
9/2008
Complete delivery of HRSG including engineering
ELM SEMBCORP PROJEKT for WILTON TEESIDE,
180t/hr of steam, 385°C, 98 bara with SF
10/2008
52
58
Reference list
ELM - WILTON Teesside,
United Kingdom
Air condensing system of TG
- Realisation project
- Complete delivery, assembly and commissioning
HRSG with accessories and MBOP
Parameters:
40 t/hr; 6,52MPa; 482 °C
9/2005
6/2006
6/2006
7/2005
Sheet No 4
Item
Customer / Site
Subject
59
KORANGI For METKA as EPC Karachi Pakistan
4 x GTG LM 6000 PC+ 1 x HRSG + 1 x STG
Start Up
Year
Combined Cycle Power Plant 225 MW
Delivery of engineering, HRSG, DCS, By-pass
12/2008
2x GE GTG LM 6000 to run in Simple Cycle till completion
60
TEKO Košice
Slovakia
61
SCPP DANTE
Customer –SSE Žilina/EdF
Slovakia
Boilers reconstruction K3, K4
2008
Simple Cycle / Peaking Power Plant 100MW
62
Reference list
CCPP SYZRAN
Customer – TGK 7 Russia
EPC contraktor SPRS
Russia
2 x GTG LM6000PC + BOP
2009
1. stage – 50MW
CCPP Syzran 200MW
2 x GTG GE Frame 6 FA + 2 x HRSG + 1 x STG
9/2010
Delivery of 2 x HRSG
Sheet No 5
II. DELIVERIES, DISASSEMBLES, ASSEMBLES,
START UP OF OPERATION
POWER ENGINEERING
Item
Customer / Site
Subject
Start Up
Year
1
SLUŽBYT m.p.
ZLATÉ MORAVCE
Hot water boilers;
4 x 1,25 MWt
8/93
2
SLUŽBYT m.p. SENEC
Pads of heat exchanger; 0,6 MPa; 160 °C
12/93
3
BIOPO a.s., LEOPOLDOV
Reconstruction of steam superheater, 25 t/hr
9/94
4
ZSE š.p., TRNAVA
Boiler K6 - reconstruction of evaporator
50 t/hr; 3,7 MPa; 240 °C
10/94
5
TŽ a.s., TŘINEC
Czech Republic
Maintenance of power plant ET a.s. Třinec
11/94
6
CHEMES a.s., HUMENNÉ
Reconstruction of control system; 50 t/hr; 3,9 MPa; 440 °C
11/94
7
MIER a.s., TOPOLČANY
Assembly of pipeline equipment, steel structure,
cooling of grate of waste wood boiler
12/94
8
SLOVNAFT a.s., BRATISLAVA
Reconstruction of Burners and Control System of Boilers;
140 t/hr; 13,6 MPa; 540°C
1/95
9
ŽELEZIARNE PODBREZOVÁ a.s.
Increasing of OKP 16 boiler efficiency to 94%
25 t/hr; 1,3 MPa; 220 °C
1/95
10
BIOTIKA a.s.,
SLOVENSKÁ ĽUPČA
Delivery and erection of steam piping lines
4/95
11
HARMANECKÉ PAPIERNE, a.s.,
HARMANEC
Delivery and erection of steam piping lines
to the paper-mill machine
4/95
12
SLOVALCO, a.s.,
ŽIAR NAD HRONOM
Delivery and erection of service platforms and of collapsible containers
4/95
13
BIOTIKA a.s.
SLOVENSKÁ ĽUPČA
Reconstruction of the electric compressor station
6/95
14
ELEKTRÁREŇ HODONÍN
Czech Republic
Assembly of pressure system of fluid Boiler
8/95
15
POWER PALNT VOJANY EVO I.
Delivery and erection of superheated and reheated Steam Pipe for Boilers;
110 MWe; 13,6 MPa; 540 °C
8/95
16
LEVITEX a.s., LEVICE
Delivery of gas regulating station and gas pipeline
9/95
BIOTIKA a.s.,
SLOVENSKÁ ĽUPČA
ČEZ a.s.,
HEATING PLANT NÁCHOD
Czech Republic
BIOTIKA , a.s.,
SLOVENSKÁ ĽUPČA
Reconstruction feed water station of secondary
cooling water and water pipe system
Emission reduction of lignitic coal fired boiler No 4 and exchange of Control
System - Fuel: Lignitic coal, Natural gas, Heavy fuel oil; 75 t/hr; 9,6 MPa;
200 °C
Cogeneration Unit, 4 MWe + 25 t/hr , 0,6 MPa, 200 °C
10/95
20
LEVITEX, a.s., LEVICE
High pressure natural gas pipe line
10/95
21
ZSE š.p., BRATISLAVA
Delivery of the heat exchange station with control system;
18 MWt
11/95
22
DEZA a.s., VALAŠSKÉ MEZIŘÍČÍ
Czech Republic
Reconstruction of the recovery boiler;
64 t/hr; 4,6 MPa; 410 °C
9/96
23
HARMANECKÉ PAPIERNE a.s.,
HARMANEC
Reconstruction of pressure system of boiler
35 t/hr; 3,73 MPa; 445 °C
2/96
24
LEVITEX a.s., LEVICE
Gasification of boilers No 2, 3; 50 t/hr; 3,9 MPa; 445 °C
10/96
17
18
19
Reference list
9/95
10/95
Sheet No 6
Item
Customer / Site
Subject
Start Up
Year
25
ČEZ a.s.
Tp DVŮR KRÁLOVÉ
Czech Republic
Emission reduction of lignite coal fired boiler and exchange of control
system - Fuel: lignite coal, natural gas, heavy fuel oil;
75 t/hr; 6,1 MPa; 485 °C
10/96
26
KRPA a.s., HOSTINNÉ
Czech Republic
Cogeneration unit - delivery and erection
2 x 4,6 MWe + 53 t/hr; 6,5 MPa; 490 °C
11/96
27
BIOTIKA a.s.
SLOVENSKÁ ĽUPČA
Reconstruction of the electric compressor station
- 2nd stage; 2000 m3/hr
1/97
28
BIOTIKA a.s.
SLOVENSKÁ ĽUPČA
Burner for firing biogas; 400 kW
3/97
29
HARMANECKÉ PAPIERNE a.s.
HARMANEC
Production, delivery and erection of pipeline in energy unit
4/97
30
ŽELEZIARNE PODBREZOVÁ a.s.
Reconstruction of flue gas duct, delivery and
erection of economizers; 25 t/hr
5/97
31
ŽELEZIARNE PODBREZOVÁ a.s.
Manufacturing, delivery and erection of gas ducts and economizers
for boilers Nr. K4, K5 2 x 5t/hr, 1,32 MPa, 220°C
5/97
32
AMYLUM SLOVAKIA, s.r.o.
BOLERÁZ
Erection of pipeline of food production
5/97
33
SCP, a.s.
RUŽOMBEROK
Ecologication of energetic economy and cogeneration plant – erection
1/98
34
LEVICKÉ MLIEKÁRNE, a.s.
LEVICE
Complete overhaul of pressure parts of boiler
OKP 16 t/hr, 1,96 MPa, 300 °C
1/98
35
DUSLO, a.s.
ŠAĽA
Gasification of boiler K5, 125 t/hr, 9,41 MPa, 540 °C
(delivery, disassembly and assembly)
1/98
36
ASSIDOMÄN PACKAGING, a.s.
ŠTÚROVO
Diagnostic of boiler K3, 150 t/hr, 9,8 MPa, 540 °C
(disassembly and assembly)
2/98
37
LEV HYDINA, s.r.o.
LEVICE
Turn-out and replacement works on boilers
K1 to K3 2,5 t/hr 1,3 MPa, 200 °C
2/98
38
AMYLUM SLOVAKIA, s.r.o.
BOLERÁZ
Basic engineering, delivery, erection 3 pcs. – 45 m3 of storage containers
(mater. cl. 17) with technology
2/98
39
HARMANECKÉ PAPIERNE, a.s.
HARMANEC
Air heater exchange
8/98
40
SCP, a.s.
RUŽOMBEROK
Exchange of valves on the upper energetic
9/98
41
VODOJEM
VEĽKÉ KAPUŠANY
Roof reparation of water-tower, hight 37 m
11/98
42
Teplárna PŘÍVOZ, OSTRAVA
Czech Republic
General reconstruction of boiler K2
11/98
43
ENERGOTRENS
TRENČÍN
Pressure parts reconstruction of boiler OB 25
12/98
44
SE EMO, a.s.
MOCHOVCE
Erection of piping lines (mater. cl. 17)
1/99
45
CUKROVAR NOVA, a.s.
Exchange of steam super heater PR II and PR III
99
46
SLOVNAFT, a.s.
BRATISLAVA
Pressure part exchange of boiler K8
2/99
47
CCB SLOVAKIA, a.s.
Delivery and erection of technological pipe lines
(mater. cl. 17), in food processing
3/99
48
DUSLO, a.s
ŠAĽA
Erection of piping lines (mater. class 17)
project: Nitrid accid
3/99
49
SCP, a.s.
RUŽOMBEROK
Erection of piping lines (mater. cl. 17) towards
to the paper-mill machine
4/99
50
LEVICKĚ MLIEKÁRNE, a.s.,
LEVICE
Condenser tubes disassembly and assembly
4/99
51
SWEDWOOD Slovakia, s.r.o.,
Malacky
Reference list
Boilers with accessories
1 x 3500 kW for heating of thermo oil for wood waste combustion
1 x 2500 kW gas boiler for thermo oil heating,
1 x 3000 kW gas fired warm water boiler
4/99
Sheet No 7
Item
Customer / Site
Subject
Start Up
Year
52
BUDIMEX, S.A. WARSZAV
Poland
Fabrication and delivery of steel construction and platform of boiler for
incinerator ZUSOK in Warsaw
6/99
53
SPARTAN, a.s., Trnava
Reconstruction of power engineering plant
6/99
54
SCP, a.s., Ružomberok
Separate flowing and combustion of CNCG gases
from striper
7/99
55
SCP, a.s., RUŽOMBEROK
Evaporator and RK modernisation
8/99
56
BUDIMEX, S.A. WARSZAV
Poland
Fabrication and delivery of boiler’s hoppers
8/99
57
ISTROFIN, a.s., LEVICE
Car showrooms reconstruction
8/99
58
STAVMONT, s.r.o., LEVICE
Facade of „Kalvin house“ reconstruction – scaffold erection
8/99
59
IEG, a.s., LEVICE
Administration building reconstruction
9/99
60
IEG, a.s., LEVICE
Car service building reconstruction
9/99
61
SCP, a.s., Ružomberok
Repair of regeneration boiler, 180 t/hr, 4.2 MPa, 400°C
12/99
62
BIOTIKA, a.s. Slov. Ľupča
Reconstruction of reduction stations
1/2000
63
SIEMENS AG, a.s.
Reconstruction of waste incineration plant Bratislava
– Fly ash transportation
7/2000
64
TRNAVSKÝ CUKROVAR, a.s., Trnava
Repair of boiler K2 – ČKD Dukla 38 t/hr
8/2000
65
FERMAS, s.r.o., Slov. Ľupča
Gas control station for new energy block
9/2000
66
OLO, a.s., Bratislava
Delivery and assembly of control system and electric part for OLO
9/2000
67
BIOTIKA, a.s. Slov. Ľupča
Main overhaul of gas turbine from Tuma Turbomach SA
9/2000
68
KÚPELE Sliač
Delivery of pressure parts of boiler
9/2000
69
SWEDWOOD Slovakia, s.r.o.,
Malacky
Delivery of technology of boiler house
11/2000
70
FERMAS, s.r.o., Slov. Ľupča
New energy block 30t/hr, 0,8 MPa, saturated steam
and new compressor station 18000 Nm3/hr + 1200 Nm3/hr
12/2000
71
TRANSPETROL, a.s., Btaislava
Erection of crude oil tank Nr. 233, 50000 m3, PS1 Budkovce
2000
72
SIEMENS AG, a.s.
Waste incineration plant Bratislava –
Design and delivery of flue gas duct line
2001
73
SCP, a.s., Ružomberok
Modernisation of regeneration boiler,
180 t/hr, 4.2 MPa, 400°C
2002
74
D&D, MIŠKOLC
Hungaria
Delivery and erection of high-speed generator of steam
2 x 1t/hr, 0,7 MPa of saturated steam
1/2002
75
PLASTIKA, a.s. NITRA
Services after guarantee period and reconstruction of boilers K1, K2, K3
1/2002
76
AK ENERJI - USAK
Turkey
Upgrading of USAK plant efficiency
4/2003
77
Spaľovňa komunálneho odpadu, a.s.
Bratislava pre HAMON s.r.o.
Delivery of steel support construction and
steam connection piping
7/2003
78
U.S. Steel, a.s. Košice
Reconstruction of burners of boiler K3
8/2003
Reference list
Sheet No 8
Item
Customer / Site
Subject
Start Up
Year
79
AK ENERJI – Kemalpasa
Turkey
Provision of Owner’s Engineering Services and partial delivery of
Combined Cycle Power Plant of 118 MWe total power output to Net
2 x GT GE 40 MWe + 2 x HRSG dual pressure + 1 x ST 38 MWe
10/2003
80
ENERGETIKA Třínec, a.s.
Čzech Republic
Coordination and Supervisory of new Condensation Turbine
25 MWe in Teplárna E2
1/2004
81
ZORLU ENERJI - Kayseri
Turkey
Combined Cycle Power Plant of 154 MWe of total power output,
EPC Contract, QA Services and Technological Supplies
3 x General Electric GT LM 6000 Sprint + 3 x HRSG Aalborg
+ 1 x ST Siemens Demag Deleval
5/2004
82
KAPPA Štúrovo, a.s.
Reconstruction of Regeneration Boiler No K6 – 25,7 t/hr of steam
6/2004
83
ENERGETIKA Třínec, a.s.
Čzech Republic
Reconstruction of cooling system in Teplárna E2 –
I. Phase – Cooling tower Nr.3
7/2004
84
ENERGETIKA Třínec, a.s.
Čzech Republic
Reconstruction of cooling system in Teplárna E2 –
II. Phase – Cooling Tower Nr. 1+ connection system of cooling pipelines
10/2005
85
KIA MOTORS SLOVAKIA
Slovakia
Delivery and installation of supporting pipeline systems for
Stamping Shop, Welder Shop, Assembly Shop, Buildings and Engine Shop
4/2006
86
ENERGETIKA Třínec, a.s.
Čzech Republic
Reconstruction of cooling system in Teplárna E2 –
I. Phase – Cooling tower Nr.2
5/2006
87
MORDOVCEMENT
Russia
Delivery of CCPP – assembly of power source at cement factory
Mordovcement, electricity output to net 80+ MWe;
Heat to town: 12 MWth; HRSG 43 t/h, 440°C, 40 bar(a)
2/2007
88
HYUNDAI MOTOR at Nošovice
Čzech Republic
Delivery and installation of supporting pipeline systems for
Stamping Shop, Welder Shop, Assembly Shop, Buildings and Engine Shop
6/2008
I&C AND ELECTRO
Item
Customer / Site
Subject
Start Up
Year
1
BIOTIKA , a.s.
SLOVENSKÁ ĽUPČA
Cogeneration Unit, 4 MWe + 25 t/hr , 0,6 MPa, 200 °C
11/95
2
TPI – BRATISLAVA
Reconstruction of heat exchange station,
12/95
3
LEVITEX, a.s.
LEVICE
Gasification of boilers K2, K3, control system, gas pope,
50 t/hr , 3,9 MPa, 445 °C
10/96
4
SCP a.s.
RUŽOMBEROL
Modification off NCG gases before combustion and modification of MoDo
incinerator for assurance of continual operation
8/97
5
SCP a.s.
RUŽOMBEROK
Reconstruction of reduction station, boiler feeding, modification of heating
system
10/97
6
SCP a.s
RUŽOMBEROK
Gasification of boilers K2, control system, gas pope,
60 t/hr, 6,28 MPa, 465 °C
11/97
7
SCP a.s.
RUŽOMBEROK
Gasification of boilers K3, control system, gas pope,
60 t/hr, 6,28 MPa, 465 °C
12/97
8
SCP a.s.
RUŽOMBEROK
Reconstruction of process control system of TG 20 MW e
1/98
9
SCP a.s.
RUŽOMBEROK
Combined cycle power plant 2 x 14 -17MW e
6/98
10
SCP a.s.
RUŽOMBEROK
Modernisation of I&C for 2 x TG 10 MWe
10/98
11
SCP a.s.
RUŽOMBEROK
Higher level of control, replacement of transformers
10/98
Reference list
Sheet No 9
12
KOVOHUTY a.s.
KROMPACHY
Intensification of Cu concentrates processing KFP,
20 kt/year
12/98
Item
Customer / Site
Subject
Start Up
Year
13
KLEIMONT s.r.o.
LEVICE
Electrostatic precipitator connection for
heat recovery boiler in EVO
12/98
14
SLZ – HNÚŠŤA
Delivery and erection of VN and NN parts
of power distribution – Revisions and building
5/99
15
IMC – CAR SHOP and SERVICE
Delivery and erection, revisions certificates
car shop
service
4/99
16
NOVÁKY OKP – 25
New control system of boiler +
exchange of field instrumentation
3/99
17
KLEINMONT, s.r.o.
Terminal boxes
4/99
18
UPGRADE – LEVITEX
Upgrade y2kk bug + Software
4/99
19
AMYL BOLERÁZ
Erection of electric instalation of syrup tanks
3/99
20
MILEX LEVICE
Milk drying, I&C
3/99
21
KLEIN MONT,a.s. Levice
22
SPARTAN, a.s., TRNAVA
Rekonštrukcia energetiky, I&C, Electric part
9/99
23
ČOV – KOZÁROVCE
Waste water treatment plant, I&C, Electric part
9/99
24
SCP, a.s., Ružomberok
Separate combustion CNCG form stripper,
MaR, Elektro
25
SE, a.s., – EMO Mochovce
Service of electric drives
26
SPP, š.p. Bratislava
Reconstruction and extension o control system
HPS Veľké Kapušany
3/2000
27
FERMAS,s.r.o., Slovenská Ľupča
New energy block, SKR
8/2000
28
ŽELEZIARNE PODBREZOVÁ,a.s.
Cogeneration plant 4,4 MWe + 18 t/hr
8/2000
29
SWEDWOOD Slovakia,s.r.o.,
Malacky
Interconnection of control systems, own consumption, lighting
8/2000
30
CT GÜEMES S.A.
Argentína
Flame detector of gas burners for boiler K 13 SALTA,
optimalization of boiler burning
9/2000
31
NCHZ, a.s., Nováky
Expansion of heat producing on Guild Nr. 5
5/2001
32
U.S. Steel, a.s. Košice
Delivery and assembly of new control system of burners
for metallurgical gasses
08/2003
33
ENERGETIKA Třinec
Čzech Republic
Delivery of I&С and Electro in scope of
reconstruction of cooling system in Teplárna E2 –
3 x cooling towers + cooling system pipings
7/2004
34
MORDOVCEMENT
Russia
Delivery of DCS for CCPP – assembly of power source at cement factory
Mordovcement, electricity output to net 80+ MWe;
Heat to town: 12 MWth; HRSG 43 t/h, 440°C, 40 bar(a)
2/2007
Reference list
-
Renovation of blocks No..5 and 6 EVO I, associative boxes
3/99
9/99
11/99
Sheet No 10
III. BASIC AND DETAIL ENGINEERING
POWER ENGINEERING
Item
Customer / Site
Subject
Start Up
Year
1
CHEMKO STRÁŽSKE a.s.
DK 105
Engineering of combustion of waste gases
160 t/hr; 13,6 MPa; 540 °C
12/92
2
MÄSOKOMBINÁT š.p.
LEVICE
Engineering of boiler house gasification,
8 t/hr; 1,4 MPa; 220 °C
6/93
3
STROJÍRNY KOLÍN, a.s.
Czech Republic
Basic and detail engineering of boiler K10 in
Tp České Budějovice
6/93
4
CHEMKO STRÁŽSKE a.s.
DK 107
Engineering of combustion of waste gases
160 t/hr; 13,6 MPa; 540 °C
7/93
5
MAYTEX a.s.
LIPTOVSKÝ MIKULÁŠ
Basic and detail engineering of boiler
reconstruction; 35 t/hr; 3,8 MPa; 445 °C
12/93
6
CHEMES a.s.
HUMENNÉ
Engineering of boiler reconstruction
and gasification; 50 t/hr; 3,83 MPa; 445 °C
4/94
7
STROJÍRNY KOLÍN a.s.
Czech Republic
Basic and detail engineering of boiler K9 in
Tp České Budějovice
4/94
8
STEEL OK-HYDROPOWER PLANT
GABČÍKOVO
Detail engineering of lock gate for lock chamber
5/94
9
SLOVENSKÉ ELEKTRÁRNE, a.s. POWER
PLANT VOJANY I.
Engineering of building subscription for fluid boilers delivery - fuel:
bituminous coal 100%; 110 MWe ; 13,6 MPa; 540 °C
5/94
10
P.K. a.s.
TREBIŠOV
Basic and detail engineering of reconstruction of boiler ceiling - fuel: coal
100%; 75 t/hr; 3,73 MPa; 445 °C
8/94
11
IZOMAT a.s.
NOVÁ BAŇA
Engineering of gasification of boiler house with hot water ELB boilers; 10
MWt
10/94
12
MIER a.s.
TOPOĽČANY
Engineering of boiler and equipment reconstruction
6 t/hr; 0,8 MPa; 220 °C
8/94
13
SLUŽBYT m.p.
NITRA
Engineering of gasification of boiler house " PÁROVCE " with hot water ELB
boilers; 12 MWt
10/94
14
ČEZ a.s., POWER PLANT
POČERADY K2 Czech Republic
Engineering of gas stabilization of boiler K2
200 MWe
7/94
15
HOTEL METROPOL, a.s.
SPIŠSKÁ NOVÁ VES
Engineering of reconstruction and gasification of boiler house; 2,5 MW t
7/94
16
PBS a.s., TŘEBÍČ
Czech Republic
Basic and detail engineering of boiler house
16 t/hr; 0,8 MPa; 171 °C
9/94
17
HARMANECKÉ PAPIERNE a.s.,
HARMANEC
Detail engineering for combined cycle
4 MWe ; 25 t/hr; 3,73 MPa; 445 °C
10/94
18
STROJÍRNY a.s., KOLÍN
Czech Republic
Engineering of general repair of reduction station and feed valves of boiler
150 t/hr; 9,42 MPa; 540°C
12/94
19
PBS a.s., BRNO
Czech Republic
Engineering of realization "ENERGOBLOK" 1,5 MWe
1/95
20
PK a.s.
TREBIŠOV
Engineering for building subscription + engineering of realization of oilgasification of boiler;
75 t/hr; 3,73 MPa; 445 °C
2/95
21
CNIM France
Audit detail engineering of boiler pressure parts; 250 t/hr
2/95
22
ABB PBS s.r.o.,
Czech Republic
Detail engineering of boiler N°4 – 75 t/hr for
Spolana Neratovice
9/95
Reference list
Sheet No 11
Item
Customer / Site
Subject
Start Up
Year
23
MST, a.s., OSTRAVA
Czech Republic
Power plant Třebovice basic and detail engineering of reconstruction of the
boiler; 220 t/hr; 11 MPa; 535 °C
3/96
24
SLOVNAFT a.s.
Heating Plant
Documentation of building arrangement and steel construction, TG 2
09/95
03/96
25
ABB PBS s.r.o., BRNO
Czech Republic
Hot water boiler - Mladá Boleslav;
58 MW; 1,6 MPa; 100/135 °C
6/96
26
ČEZ a.s.,
Power Plant TISOVÁ
Demolition, boiler room, separators, waste gases lines, pipe-line bridges,
transforming station, compressor plant, ashen economics, control room
09/96
27
SCP, a.s. RUŽOMBEROK
Output of power from combined cycle (2 x 17 MWe)
6/97
to 6/98
28
PBS a.s., BRNO
Czech Republic
Steam boiler-Pakistan; 95 t/hr; 6,28 MPa; 485 °C
2/97
29
SLOVAKOPRESS
Electrical adapter distributors
3/97
30
Hospodárske noviny
UPS – uniterruptable power system for LANs
5/97
31
SIEMENS a.s.,
Heating Plant BRATISLAVA II
Heating Plant Bratislava II – PPC 157 MWe combustion turbine + 63 MW e
steam turbine 215 MWe maximal
power output
02 / 96
to
12 / 96
32
SCP a.s., RUŽOMBEROK
Control room PPC in SCP Ružomberok
9/97
33
SIEMENS A.G. OLO BRATISLAVA
Reconstruction of communal waste incinerator
02/98
34
ALDY - EBO
Reconstruction of join elements in piping lines
2/98
35
ALDY - EBO
Reconstruction of alarm items in control room CHV
4/98
36
PPA - EBO
Control system for mixing of heated cooling water
2/98 - 9/98
37
PPA - EBO
Spare RS on steam and level of condensate
9/98
38
POĽNOBANKA a.s.
Transformation station 22/0,4 kV - Krížna street
9/98-1/99
39
DUSLO, a.s., ŠAĽA
Cross Connection of Flue Gas Duct from Boiler K3 to Electro Solid
Separator of Boiler K5
5/98
40
BTZ-VSŽ UNIKORN, TORNAĽA
Engineering Works for Project of Cogeneration Plant
6/98
41
TRANSELEKTRO Ltd.
Hungary
Coordination documentation for tender evaluation
first stage
9/98
42
TRANSELEKTRO Ltd.
Hungary
Coordination documentation for tender evaluation
second stage
2/99
43
SPARTAN, a.s., TRNAVA
Project of Energetic Reconstruction - using boiler with combustion of waste
wood
2/99
44
KLEIN MONT, s.r.o., LEVICE
Project of wood combustible transportation
to the boilers K3 and K4
6/99
45
SPOLANA, a.s., NERATOVICE
Czech Republic
Project for building permission and EIA
6/99
Reference list
Sheet No 12
Item
Customer / Site
Subject
Start Up
Year
46
SCP, a.s., RUŽOMBEROK
Combined cycle power plant
1x 70 MW e + 1 x 100 t/hr of steam, 6,28 MPa; 465 °C
6/99
47
SPOLANA, a.s., Neratovice
Česká republika
Project for building permission
6/99
48
SCP, a.s., Ružomberok
Separate flowing and combustion of CNCG gases from striper
7/99
49
SH Energo, a.s., Senica
Installation of energy source
2 x 6,5 Mwe, + 2 x 12t/hr, 1,8 MPa, 250 °C
50
SCP, a.s., Ružomberok
Project for building permition – Cogeneration unit No3,
65 MWe , 108 t/hr, 6,28 MPa, 465 °C
8/99
51
SPS, a.s., Ružomberok
Project for building permission. Air condensation
53 t/hr behind of 20 MWe steam turbine
8/99
52
KLEIN MONT, s.r.o., Levice
Project of transportation of coal to boiler K3 and K4
11/99
53
BIOTIKA, a.s. Slov. Ľupča
Reconstruction of reduction stations
1/2000
54
HARMANECKÉ PAPIERNE, a.s.
New energy source, 20 t/hr, 1,4 MPa, saturated steam
2/2000
55
SLOVENSKÝ HODVÁB, a.s., Senica
Project for building permission
3/2000
56
HARMANECKÉ PAPIERNE, a.s.
Gasification of drying covering of PS7 – Realisation project
5/2000
57
FERMAS, s.r.o., Slov. Ľupča
Design and engineering activities by obtaining of building permission for
installation of new energy block
6/2000
58
KLEIN MONT, s.r.o., Levice
Detail engineering of steel structure under el. current dryer
7/2000
59
SIEMENS AG, a.s.
Reconstruction of waste incineration plant Bratislava –
Fly ash transportation
7/2000
60
SWEDWOOD Slovakia, s.r.o.,
Malacky
Realisation project – boiler house civil parts
8-9/2000
61
LESY slov. republiky,
Banská Bystrica
Project documentation of boiler house
9/2000
62
SWEDWOOD Slovakia, s.r.o.,
Malacky
Realisation project – boiler house and distribution piping lines of thermooil
and water,
1 x 3500 kW for heating of thermooil for wood waste combustion,
1 x 2500 kW gas fired boiler for thermooil heating,
1 x 3000 kW gas fired warm water boiler
9/2000
63
FERMAS, s.r.o., Slov. Ľupča
Gas control station for new energoblock
9/2000
64
SH – ENERGO, a.s. Senica
65
CT GÜEMES S.A.
Argentina
66
SIEMENS AG, a.s.
Reconstruction of waste incineration plant Bratislava – Project of civil part
and electro
12/2000
67
KLEIN MONT, s.r.o., Levice
Design of civil parts for electrostatic precipitator
for Cement works, a.s. Ladce
12/2000
68
SCP, a.s., Ružomberok
Modernisation of regeneration boiler, 180 t/hr, 4.2 MPa, 400°C
69
ŽELEZIARNE PODBREZOVÁ, a.s.
Cogeneration Unit 18 t/hr, 1,3 MPa, 4,4 MWe
2000
70
SIEMENS AG, a.s.
Municipal waste incinerator in Bratislava –
Project and deliveries of flue gas ductings
2001
71
SWEDWOOD Slovakia, s.r.o.,
Malacky
Realisation Project – Air engineering
3/2001
Reference list
Project for civil permission,
Realisation project of cogeneration unit 2 x 6,5 MW e + HRSG with
supplementary firing 2 x 30 t/hr of steam
Flame detector of gas burners 9 x 42,8 MWt
and optimalization of boiler burning
10/2000
10/2000
2002
Sheet No 13
Item
Customer / Site
Subject
Start Up
Year
72
CEMENTÁREŇ LADCE
Electrostatic precipitator for „Clink“ cooler
3/2001
73
HARMANECKÉ PAPIERNE, a.s.
Installation of new heat source – Realisation Project
2001
74
D&D, MIŠKOLC
Hungaria
Delivery and erection of high-speed generator of steam
2 x 1t/hr, 0,7 MPa of saturated steam
6/2001
75
U.S. Steel, s.r.o., Košice
Documentation – measurement of emission to the air
10/2001
76
Malženice Power, s.r.o.
Engineering for building of Cogeneration Plant in Malženice
2002
77
SIEMENS, s.r.o.
OLO Bratislava
Project of actual realization
2002
78
FORTUNAE- LEVEN, a.s. LEVICE
Realisation Project of interconnection of piping lines LEVEN - FORTUNAE
5/2003
79
ENERGETIKA Třinec, a.s.
Čzech republic
Supervisory by installation of
new steam turbine 25 MWe
3/2004
80
Spaľovňa komunálneho odpadu, s.r.o.
Bratislava
„As build„ Project of steam line
7/2003
81
KAPPA Štúrovo, a.s.
Realization Project and Detail Engineering for reconstruction of
regeneration Boiler K6 – 25,7 t/hr of steam
6/2004
82
ZORLU ENERJI – Kayseri
Turecko
83
UNIT INTERNATIONAL S.A.
Belgium
Combined Cycle 154 MWe , EPC contract
Technical assistence and technological deliveries for
3 x General Electric GT LM 6000 Sprint + 3 x HRSG Aalborg
+ 1 x ST Siemens Demag Deleval , Supervision of erection
Service Arangement for Technical Consulting and Engineering Services,
Rudeshur Iran, CCPP – 750 MWe of total power output
84
UNIT INTERNATIONAL S.A.
Belgium
Service Arangement for Technical Consulting and Engineering Services,
Dier Al Zor Syria, CCPP – 750 MWe of total power output
85
TEKO Košice
Project of realization for Air Condensation of Turbogenerators
9/2004
86
ENERGETIKA Třinec, a.s.
Čzech republic
Project for building permission –
Installation of new boiler for combustion of metallurgical gases of 80 t/hr
10/2004
87
ADVANCED POWER AG &
SIEMENS PROJECT VENTURE GmbH
Engineering activities Related to the Execution of Gasfired Combined Cycle
Power Plant 400 MW for Malženice Power – Documentation for Zoning
and Planing Approval
7/2006
88
METKA Kesk
Engineering, Basic and Detail Design, Tender specification preparation,
5/2004
7/2004
7/2004
1/2007
Commissioning of Work
89
EREN ENERJI, Catalagzi
Turecko
Engineering for Zongulak Power Plant block 160 MW e,
1/2007
Coal Power Plant (1 block)
90
MORDOVCEMENT
Russia
Engineering for CCPP – assembly of power source at cement factory
Mordovcement, electricity output to net 80+ MWe;
Heat to town: 12 MWth; HRSG 43 t/hr, 440°C, 40 bar(a)
91
OGK
Russia
Sargutská CCPP 400 MW, Jajvinská CCPP 400 MW
2/2007
Technical Agent for Power Plants
2007
Šaturská 2 x 400 MW, Berezovská 750 MW
92
Třinecké železárny
Čzech Republic
Stack part reconstruction K2
2007
93
ALMATY
Kazachstan
Basic & Detail engineering of Plant + erection supervisory incl.
Commissioning
2007
94
EON Elektrárne, s.r.o.
Engineering Works - Project for Civil Works permit
2007
95
SPC – DSI
Izrael
Engineering Works for Combined Cycle Plant 110MW,
96
Reference list
METKA
Grece
2007
Dimona Izrael
4 x Bypass ,1 x HRSG, 1 x DCS, Engineering
2007
Sheet No 14
Item
Customer / Site
Subject
Start Up
Year
97
TEKO
Slovakia
Technical Audit
2007
98
SPP
Slovakia
MAT/0723 – Delivery of heat on KS02
2007
Engineering Works - Project for Civil Works permit
2007
EON Elektrárne, s.r.o.
Slovakia
Volžská teritoriálna generujúca
spoločnosť, a.s.
Russia
Samara Service
Russia
Technical modernization of Plant Novokujbiševskaja
2008
HRSG za LM2500 for Samara GRES – supervisory of erection
2008
102
SSE, a.s., Žilina
Slovakia
DANTE – Plant Panické Dravce
2008
103
GGE
Slovakia
Heat Source delivery PPC – Považská Bystrica
2008
104
TEKO
Slovakia
Reconstruction of boilers PK3 a PK4
2008
99
100
101
Reference list
Sheet No 15
IV. STUDIES AND ENERGY AUDITS
POWER ENGINEERING
Item
Customer / Site
Subject
Start Up
Year
1
BME NOVÁKY
Study of heat recovery boiler; 25 MW
9/92
2
CHEMKO STRÁŽSKE a.s.
DK 105
Study and project of combustion of waste gases;
160 t/hr; 13,6 MPa; 540 °C
12/92
3
VAB a.s.
BÁNOVCE NAD BEBRAVOU
Study of gasification; 1,5 MWt
2/93
4
CHEMKO STRÁŽSKE a.s.
Study for emission reduction of SO2 a NOx
160 t/hr; 13,6 MPa; 540 °C
2/93
5
CHEMKO STRÁŽSKE a.s.
DK 107
Study and project of combustion of waste gases;
160 t/hr; 13,6 MPa; 540 °C
7/93
6
ZSNP a.s.
ŽIAR NAD HRONOM
Study of installation of gas turbine before reconstructed to a heat recovery
boiler; 25 MWe +75 t/hr; 3,92 MPa; 440 °C
7/93
7
VSŽ a.s. KOŠICE
Study of set-up of steam-gas equipment
40 MWe +215 t/hr; 13,6 MPa; 540 °C
10/93
8
NÁBYTOK a.s.
KRÁĽOVSKÝ CHLMEC
Study of gasification of boiler house together
with heating of place; 8 t/hr; 0,9 MPa; 176 °C
5/94
9
TŽ a.s. TŘINEC ENERGETIKA
Czech Republic
Study of reconstruction of boiler K12,
125 t/hr; 9,4 MPa; 540 °C
12/94
10
TŽ a.s. TŘINEC ENERGETIKA
Czech Republic
Study of set-up of steam-gas equipment,
60 MWe + 30,3 MWe
12/94
11
SCP, a.s., RUŽOMBEROK / FICHTNER
Technic-economic study of power energy economy of plant;
2/95
60 MWe + 635 t/hr
12
VSŽ a.s. KOŠICE
Study of the reconstruction of the steel work No 1
5/95
13
NAFTA a.s. GBELY
Heat recovery from gasturbine exhaust gas
(1st part of Study)
7/95
14
CHEMOPETROL a.s. LITVÍNOV
Czech Republic
Technical - economical solution of repair for ensuring continuous operation
of boiler N° 1 - 110 t/hr - ethylen
8/95
15
DUSLO a.s. ŠAĽA
Economical analysis of thermal plant reconstruction
1/96
16
SERVICE ESTABLISHMENT
SENEC
Reconstruction of gas plant
4/96
17
NAFTA a.s. GBELY
Heat recovery from gas turbine exhaust gas
(2nd part of Study)
5/96
18
VSŽ OCEĽ s.r.o. KOŠICE
Technic-economic-ecology study on overhanding and modernization of
boilers K4 - K6
8/96
19
CHEMOSVIT a.s. SVIT
Energy investment study
9/96
20
VP a.s. FRÝDEK MÍSTEK
Czech Republic
Technical-economical analysis of cogeneration unit use
9/96
21
ŽELEZIARNE PODBREZOVÁ a.s.
Balance of the requirement for thermal energy
10/96
Energy investment study
97
Study of installation of gas turbine before reconstructed to a heat recovery
boiler; 21 MWe + 125 t/hr; 10 MPa; 510 °C
97
Energy investment study - evaluation of present state and new technical
proposal
97
22
23
24
JUHOCUKOR a.s.
DUNAJSKÁ STREDA
ČEZ a.s. ELEKTRÁREŇ POŘÍČÍ
Czech Republic
ZŤS a.s. DUBNICA NAD VÁHOM
25
VSŽ a.s. KOŠICE
26
BARUM CONTINENTAL
Reference list
Realization Costs Proposal on Overhaul in Power Division Plant for:
- Boiler K2
1 x 215 t/hr steam
- Boiler K5
1 x 215 t/hr steam
- Back-pressure turbine TG3 1 x 28 MWe
- Back-pressure turbine TG4 1 x 28 MWe
- Oxygen Equipment No8
35000 m3/hr oxygen (85% O2)
Study
11/98
11/98
11/98
11/98
11/98
1998
Sheet No 16
Item
Customer / Site
Subject
Cogeneration Plant – feasibility study of utilization in
ESMO Mohelnice
A: GT 4 MWe + waste-heat boiler 14 t/hr of steam with supplementary
firing (9 t/hr without supplementary firing)
B: GT 6,3 MWe + waste-heat boiler 13 t/hr of steam without
supplementary firing
Start Up
Year
27
ESMO MOHELNICE s.r.o.
Czech Republic
28
MERINA a.s. TRENČÍN
Audit of Energy Economy
8/98
29
KLF-ZVL
Economical analysis of cogeneration plant 2 x 4 MW e
8/98
30
ZSNP a.s. ŽIAR nad HRONOM
Technical – economic analysis of cogeneration plant using
and utilization in ZSNP, a.s., Žiar nad Hronom
A: GT 2x6,3 MWe + waste-heat boiler 2x50 t/hr of steam with
supplementary firing
(2x12 t/hr without supplementary firing)
B: GT 40 MWe + waste-heat boiler 100 t/hr of steam with supplementary
firing (60 t/hr without supplementary firing) + condensate steam
extraction turbine
9/98
31
INFER a.s. LUČENEC
Cogeneration Plant – feasibility study of utilization
in VSŽ UNICORN Tornaľa - Cogeneration gas motor unit
815 kWe + 1227 kWt + gas boiler 11,6 MWt
10/98
32
HARMANECKÉ PAPIERNE a.s.
HARMANEC
Economical analysis of cogeneration plant use in a.s.
Harmanecké papierne;
A: GT 6,5 MWe + waste-heat boiler 30 t/hr of steam with supplementary
firing (12,5 t/hr without supplementary firing)
B: Cogeneration gas motor unit 3x2086 kWe + 3x380 kWt + steam
generator 1x3,5 t/hr
11/98
33
PARAMO a.s. PARDUBICE
Czech Republic
Study of utilization of cogeneration plant used
in a.s. PARAMO Pardubice
12/98
34
COMMUNAL POWER PLANT
IN LEVICE
Technical – economic analysis of utilisation of cogeneration plant for
requirement of city Levice
3/99
Study of power plant economy in Alternatives
A: steam gas boiler 35 t/hr steam
B: two steam gas boilers 2 x 20 t/hr steam
C: cogeneration plant 12,3 MWe + 35 t/hr steam
D1: two cogeneration plants 2x3,5 MWe + 2x20 t/hr steam
D1: two cogeneration plants 2x6,8 MWe + 2x20 t/hr steam
2/99
8/98
35
TENTO a.s. ŽILINA
36
CHEMKO STRÁŽSKE a.s.
Study of utilisation of cogeneration plant used
In Chemko Strážske, a.s. – 5 alternatives
3/99
37
VOLKSWAGEN a.s.
Study for enlarging heating in VW Bratislava
3/99
38
ZBROJOVKA VSETÍN a.s.
Czech Republic
Study of power plant economy
7/99
39
CINERGY
ENERGETIKA CHROPINĚ
Czech Republic
Study of utilization of cogeneration plant use
in ENERGETIKA Chropině power plant
6/99
40
SPP, š.p., Bratislava
Technical – economical study of installation and utilisation of cogeneration
plant
7/99
41
SCP, a.s., RUŽOMBEROK
Study of Separate Treatment of CNCG from Stripper
1/2000
42
PRVÁ PAROPLYNOVÁ SPOLOČNOSŤ,
a.s.
Technical – economical study of installation of plasma technology by
processing of feral concentrate in locality of town Sereď
1/2000
43
SPP, š.p., Bratislava
Technical – economical study of installation of energy source on
underground storage of natural gas Gajary
5/2000
44
SPP, š.p., Bratislava
Utilisation of waste heat from flue gases in KS02
in town Jabloňov nad Turňou
6/2000
Reference list
Sheet No 17
Item
Customer / Site
Subject
Start Up
Year
45
ZVL KLF, a.s.
Kysucké Nové Mesto
Economical evaluation of cogeneration plant for ZVL KLF
6/2000
46
SCP, a.s.
Ružomberok
Technical – economical study of new energy central
in plant SOLO
7/2000
47
SPP, š.p.
Bratislava
Technical – economical study of installation of cogeneration production of
electric power and heat on KS01
in town Veľké Kapušany
8/2000
48
NCHZ, a.s. Nováky
Technical evaluation of existing pressure system of boiler
9/2000
49
CENTRAL TÉRMICA
GÜEMES, S.A.
Argetina
Study “Prevention of Deposit Formation on Spray Nozzles of Superheater
Atteperators” (135 MW unit) and Implementation of the proposed
arrangements
9/2000
50
MATADOR, a.s.
Púchov
Technical-economical study of installation of cogeneration production of
electric power and heat in MATADORe, a.s.
10/2000
51
GARDEN, spol.s r.o
Lučenec
Technical-economical study of implementation of cogeneration in Shping
part of Lučenec town
10/2000
52
VULKAN,a.s.
Partizánske
Technical and economical study of renovation
of energy economy
4/2001
53
SPP, š.p.
Bratislava
Repowering of JE V-1 by installation based on natural gas in
SE, a.s. - AE Bohunice
5/2001
54
SH-ENERGO,a.s.
SENICA
Ekonomical evaluation of cogeneration in conditions of
a.s. SH-ENERGO
5/2001
55
Continental Matador s.r.o. Púchov
Technical-economical study of energy economy
6/2001
56
BIOTIKA, a.s.
Slovenská Ľupča
Revaluation of possibilities of increasing of steam output of waste heat
recovery boiler
6/2001
57
CHEMKO STRÁŽSKE, a.s.
Evaluation of existing conditions and alternatives of future development of
energy plant
7/2001
58
59
60
FRANTSCHACH
PULP & PAPER, a.s. Štětí
Czech Republic
FRANTSCHACH
PULP & PAPER, a.s. Štětí
Czech Republic
SSE Žilina, š.p.
Ground analyze of increased failure cause
of PR3 regeneration boiler
7/2001
Optimalization of injection regulation of regeneration boiler
7/2001
Study of evaluation of conversion heat producing operation to power
producing operation
on Block B1 in Heating Plant Zvolen
7/2001
Reconstruction of incinerator on Guild Nr. 4
9/2001
NCHZ, a.s.
Nováky
GASFIN, a.s.
Lučenec
ENERGETIKA Třinec, a.s.
Czech Republic
BIOTIKA, a.s.
Slovenská Ľupča
Leven, a.s.
Levice
Technical and Economical evaluation of power station
in condition of industrial establish in Lučenec
9/2001
Evaluation of existing conditions of technical base of ET, a.s.
Power Unit 2 x 55 MWe
9/2001
Revaluation of increasing of steam power
2002
Interconnection of steam power
2002
66
Bratislavská teplárenská,a .s.
Analysis of realization
2002
67
PRAŽSKÉ STAVBY, a.s.
závod Spalovna Malešice
Czech Repblic
Technically – economical analyse of possibilities of utilization of „waste“
steam from incinerator in Malešice
5/2003
68
ACHEMA S.C.
Litva
Feasibility study. Coal fired power plant 100-400 MW
Part 1 – Power Plant
Part 2 – Coal Export –Import terminal
5-6/2003
61
62
63
64
65
Reference list
Sheet No 18
Item
Customer / Site
Subject
Start Up
Year
69
ENERGETIKA Třínec, a.s. Třínec
Čzech Republic
Technically – economical analyse of renovation of boilers K1 a K2 of power
2 x 62 t/hr for combustion of metallurgical gasses
7/2003
70
ENERGETIKA Třínec, a.s. Třínec
Čzech Republic
Study of optimalisation of cooling system in Power Plant E2
4/2004
71
ENVIRAL, a.s. Leopoldov
Slovakia
Study of energy consumption
12/2005
72
US STEEL Košice
Slovakia
Change of existing boiler K2 and K3 – skilled study of otimalisation of
replacement in 9. alternatives
3/2006
73
CENGIZ ENERJI
Turecko
Seydisehir Aluminyum´s power plant facility
Feasibility study
4/2006
74
MORAVSKÉ TEPLÁRNY, a.s. Zlín
Czech Republic
Study – Condensation steam turbine with el. generator
10/2006
75
SHP CELEX, a.d. Banja Luka
Bosna & Hercegovina
Technical & Economy Study for assembly of Heat source
11/2006
Project documentation and qualified supervisory
2006
76
SPP Nitra
Slovakia
77
TEPLÁREŇ Košice
Slovakia
Technical Audit in TEKO, a.s.
5/2007
78
SMREČINA HOFATEX, a.s.
Slovakia
Study – Possibility of increasing of heat and electricity production in SH
7-9/2007
79
ROMENERGO, a.s.
Study for new source of power energy
2007
Developing Study
2007
Study – New power source
2008
80
TEKO
Slovakia
81
PLASTIKA Nitra
Slovakia
***
CCPP – Combined Cycle Power Plant
BOP – Balance of Plant
MBOP – Mechanical Balance of Plant
EBOP – Electrical Balance of Plant
a.s. – Shareholders company
Reference list
Sheet No 19
Download

REFERENCE LIST OF COMPANY